PARTNERS AND SUPPORT (WORK MANAGEMENT GUIDANCE AND PROCEDURES)
CHAPTER 1 - INTRODUCTION - EP-1130-2-5000007
CHAPTER 2 - PROJECT MANUALS
CHAPTER 3 - MAJOR REHABILITATION PROJECTS
Guidance. - EP-1130-2-5000010
CHAPTER 4 - PROGRAM EVALUATION THROUGH A PEER REVIEW PROCESS
CHAPTER 5 - PROJECT MAINTENANCE
CHAPTER 6 - SIGN STANDARDS PROGRAM FOR CIVIL WORKS PROJECTS
Safety messages will not be placed on "Notice" signs.
CHAPTER 7 - PLANT
Other Plant Improvement Programs (excluding hopper dredges).
Corps of Engineers Marine Engineering Board.
Authority for Additions and Betterments.
Guidance - Designs, Plans, and Specifications.
Preparation and Approval of Plans and Specifications.
Guidance - Standards and Inspection of Construction.
Guidance - Standards and Inspection of Construction. (cont)
Section II. Floating Plant Identification And Record Information
Standards for Marking Floating Plant.
CORPS OF ENGINEERS U.S. ARMY
Stern Designation.
Barges with Deckhouses Less Than One-Quarter Barge Length.
Descriptive Data.
LENGTH OVERALL
DISPLACEMENT, LIGHT - LONG TONS:
MATERIAL OF HULL:
CONSTRUCTION COST
Photographs of Plant
Inspection
Survey of Repairs Required
Hopper dredge allowable draft is limited to ABS loadline limits
Reports of Plant Operations
Manning and Licensing.
Section IV. Corps of Engineers Marine Engineering Board
Responsibilities - EP-1130-2-5000040
CHAPTER 8 - CORPS OF ENGINEERS ENERGY PROGRAM (CEEP)
CHAPTER 9 - COOPERATING ASSOCIATIONS PROGRAM
Corps personnel may not
The responsibilities of the Corps and the Association
CHAPTER 10 - THE CORPS OF ENGINEERS VOLUNTEER PROGRAM
Most individuals can qualify to become volunteers for the Corps.
Protection and Benefits.
Identification.
Forms.
CHAPTER 11 - CONTRIBUTIONS PROGRAM
Accounting and Reports.
Recognition and Publicity.
CHAPTER 12 - CHALLENGE COST SHARING PROGRAM
Accounting and Reports
On-site Recognition.
CHAPTER 13 - CIVIL WORKS HOUSING
CHAPTER 14 - AQUATIC PLANT CONTROL PROGRAM
Initial Appraisal.
Management Operations.
The APCOSC will present an annual report of operations at the Annual Research
CHAPTER 15 - ACQUISITION OF PLANT, OWNERSHIP, AND FINANCIAL MANAGEMENT
Chapter 16. ACCESSIBILITY
APPENDIX A. References - EP-1130-2-5000064
APPENDIX A. References (cont) - EP-1130-2-5000065
APPENDIX A. References (cont) - EP-1130-2-5000066
Appendix B. REHABILITATION EVALUATION REPORT
Format and Content of Rehabilitation Evaluation Reports.
Economic Considerations.
Table B-1. Base Condition - Summary
With Rehabilitation Condition.
Engineering Considerations.
Engineering Consequences.
Guidance. - EP-1130-2-5000074
Assessment of Alternatives
Cost Sharing Considerations.
Appendix C. CONCEPTUAL APPROACH FOR ANALYZING REHABILITATION
Figure C-1: Expected Value of Service Flows and Rehabilitation
Figure C-2. Distribution of Service Level and Reliability
Conclusion.
Appendix D. INTRODUCTION TO AN ASSESSMENT OF STRUCTURAL RELIABILITY
Calculation of Probability of Unsatisfactory Performance.
Hazard Function.
Analysis Procedures.
Target Reliability Values.
Outline for Reliability Analysis Report.
Alternative Studies.
Reliability Analysis Decision Making Flow Charts
Figure D-1
Figure D-1 continued - EP-1130-2-5000090
Figure D-1 continued - EP-1130-2-5000091
Appendix E. BENEFITS EVALUATION PROCEDURES
Navigation Analysis.
Compute benefits.
Appendix F. EXAMPLE OF COMBINING RISKS AND CONSEQUENCES
Table F-2: Energy and Capacity Opportunity Costs
Figure F-2: Non-linear Risk Function
Description of Monte Carlo Simulation.
Table F-3: Base Condition Life-cycle Costs (Standard Errors in Parenthesis)
Table F-4: Immediate Rehabilitation Life-cycle Costs (Standard Errors in Parenthesis)
Table F-5: Summary Statistics of Rehabilitation Strategy
Appendix G. EXAMPLES OF POTENTIAL ENTRIES AND DESCRIPTIVE FOOTNOTES TO SUPPORT TABLE B-1 OF APPENDIX B.
ASSESSMENT
RELIABILITY
ENVIRONMENTAL
Appendix H. HYDROPOWER EVALUATIONS CONSIDERATIONS
Analysis of Existing Facilities.
Appendix I. OUTLINE OF A TYPICAL DESIGN MEMORANDUM FOR A HOPPER DREDGE
House and Superstructure
MACHINERY
RECOMMENDATIONS
Appendix J. TYPICAL PLANT IDENTIFICATION ILLUSTRATIONS
Appendix J. TYPICAL PLANT IDENTIFICATION ILLUSTRATIONS (cont)
Appendix J. TYPICAL PLANT IDENTIFICATION ILLUSTRATIONS (cont) - EP-1130-2-5000114
Floating Crane
Fuel and Water Barge
Mooring Barge
Derrick Boat, Fixed Non-Revolving
Dredge - Dipper
Dredge - Hopper
Dredge - Sturcasting
Appendix J. TYPICAL PLANT IDENTIFICATION ILLUSTRATIONS (cont) - EP-1130-2-5000122
Dump Scow
Launch
Launch - Catamaran Type Class 2
Mattress Sinking Plant - EP-1130-2-5000126
Needleflat
Patrol Boat Class 2
Patrol Boat Class 4
Stern View Snagboat / Towboat
Survey Boat Class A and Class 1
Survey Boat Class 4
Tender Class 2
Towboat Class 4
Tugboat Class 3
Appendix K. SIZE AND SPACING OF IDENTIFICATION DESIGNATIONS
Table K-1. Dimensions for Designations
Table K-2. Dimensions for Designations
Barge Designation Arrangements
SECTION THRU INSIGNIA FASTENERS
Appendix L. INSPECTION AND CERTIFICATION AGREEMENT BETWEEN AND U. S. ARMY CORPS OF ENGINEERS U.S. COAST GUARD
Plan Approval.
Appendix M. CORPS OF ENGINEERS MOTORBOAT LICENSE GENERAL REQUIREMENTS
Procurement.
Appendix N. U. S. COAST GUARD APPROVED PERSONAL FLOATATION DEVICES
Appendix O. CORPS OF ENGINEERS MARINE ENGINEERING BOARD MEMBERSHIP
Appendix P. SAMPLE AGREEMENT
CORPS RESPONSIBILITIES
ASSOCIATION RESPONSIBILITIES.
Fiscal Management.
JOINT RESPONSIBILITIES.
MODIFICATION AND AMENDMENTS.
Appendix Q. SAMPLE COOPERATING ASSOCIATION ARTICLES OF INCORPORATION AND BY-LAWS
Article I. Purposes
Article III. Organization and Administration
The Treasurer may not be a member of the Corps of Engineers paid staff.
Article IV. Meetings
Article VI. Miscellaneous
Appendix R. EXAMPLES OF FORMS USED IN THE VOLUNTEER PROGRAM
Appendix R. EXAMPLES OF FORMS USED IN THE VOLUNTEER PROGRAM (cont)
Appendix R. EXAMPLES OF FORMS USED IN THE VOLUNTEER PROGRAM (cont)
Appendix S. SAMPLE CERTIFICATE OF APPRECIATION
Appendix T. SAMPLE CHALLENGE COST-SHARING FINANCIAL WORK SHEET
Appendix U. SAMPLE CHALLENGE COST-SHARING AGREEMENT
ARTICLE II - OBLIGATIONS OF THE PARTIES - EP-1130-2-5000166
ARTICLE IV - DISPUTE RESOLUTION
ARTICLE V - FEDERAL AND STATE LAWS
ARTICLE X - NOTICES
ARTICLE XI - CONFIDENTIALITY
Appendix V. RECONNAISSANCE REPORTS INFORMATION REQUIREMENTS
Appendix W. MODEL DETAILED STUDY COST-SHARING AGREEMENT BETWEEN THE UNITED STATES OF AMERICA
ARTICLE I - DEFINITIONS
ARTICLE III - INITIAL PROJECT MANAGEMENT PLAN
ARTICLE IV - METHOD OF PAYMENT
ARTICLE VI - DISPUTES
ARTICLE X - FEDERAL AND STATE LAWS
INITIAL PROJECT MANAGEMENT PLAN FOR A MODEL
CERTIFICATION REGARDING LOBBYING
Appendix X. MODEL LOCAL COOPERATION AGREEMENT AQUATIC PLANT CONTROL OPERATIONS BETWEEN THE DEPARTMENT OF THE ARMY
ARTICLE II - OBLIGATIONS OF THE PARTIES - EP-1130-2-5000181
ARTICLE III - LANDS, FACILITIES, AND RELOCATION ASSISTANCE
ARTICLE V - CONTRACT MANAGEMENT
ARTICLE VII - DISPUTES
ARTICLE XI - RELATIONSHIP OF PARTIES
ARTICLE XV - NOTICES
CERTIFICATE OF AUTHORITY
Appendix Y. INFORMATION REQUIREMENTS FOR ENVIRONMENTAL ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS
Biological Control
Appendix Z. MINIMUM WORK REQUIREMENTS
Integrated control
Plant and Equipment.
Appendix AA. ANNUAL WORK PLANS
Public Notification.