EP 1130-2-500
27 Dec 96
av. ER 1165-2-400, Recreational Planning, Development, and Management Policies.
aw. ER 1180-1-6, Construction Quality Management.
ax. EP 310-1-6, Graphic Standards Manual.
ay. EP 310-1-6A, Sign Standards Manual, Vol. 1.
az. EP 310-1-6B, Sign Standards Manual, Vol. 2.
ba. EP 690-1-11, Command -wide recruitment and Outreach Materials.
bb. EP 1130-2-434, Interpretive Services and Outreach Program, Volumes 1-5, JS, DI, and FS.
bc. EM 385-1-1, Safety and Health Requirements Manual
bd. EM 1125-2-312, Manual for Instructions - Hopper Dredge Operations and Standard
Reporting Procedures.
be. "Guidance for Major Rehabilitation Projects for Fiscal Year 1998," issued with the letter
(same subject) from Mr. Daniel R. Burns, P.E., Chief, Operations, Construction, and Readiness
Division, Directorate of Civil Works, dated 29 September 1995.
bf. Interpreter's Handbook Series - Contact: Dr. Michael Gross, College of Natural Resources,
University of Wisconsin - Stevens Point, Stevens Point, WI, 54481.
bg. Interpreting Our Heritage, Tilden, Freeman; The University of North Carolina Press, 1967.
bh. The Great Outdoors Funbook, U.S. Army Corps of Engineers, 1993.
bi. Interagency Agreement of Operations and Guidelines Between Federal Prison Industries, U.S.
Bureau of Prisons and U.S. Army Corps of Engineers, October 27, 1992.
A-3