PRE-DESIGN LEAD/ASBESTOS SURVEY STANDARD SCOPE OF WORK
NOTE TO PROJECT SCOPE EDITOR
PROJECT OVERVIEW, OBJECTIVES, AND DESCRIPTION OF WORK - EP-1110-1-300006
State and Local
SITE CHARACTERIS TICS, OBJECTIVES AND DESCRIPTION OF WORK
Previous Studies and Results - EP-1110-1-300009
Table A-1. Lead/Asbestos Survey Action Levels
PROJECT REQUIREM ENTS
CURRENT CONDITIONS/PROJECT WORK PLAN
Visual Examination
Lead Sampling
Lead Sampling (cont)
Asbestos Sampling
Waste Characterization and Quantity Estimation
Asbestos
TASK 3 SAMPLE DATA ANALYSIS, EVALUATION OF FINDINGS - EP-1110-1-300019
Field Analysis of Paint Samples (Lead)
Project Data Review and Assessment - EP-1110-1-300021
TASK 4 SURVEY REPORT
Contractor Data Certification - EP-1110-1-300023
SUPPLEMENTAL REQUIREMENTS FOR CONTRACTED SERVICES - EP-1110-1-300024
PROJECT RECORDS - EP-1110-1-300025
PROJECT COORDIN ATION
Security and Escorts
TRAVEL AND MEETINGS - EP-1110-1-300028
SUBMITTALS - EP-1110-1-300029
Glossary - EP-1110-1-300030
Surfacing Material
APPENDIX B - STANDARD PRE-DESIGN SURVEY TABLES AND FORMS
Table B-1. Building/Units to be Surveyed
Table B-2. Examples of Interior and Exterior Building Component Types
Table B-3. Asbestos-Containing Materials Found in Buildings
Table B-3. Asbestos-Containing Materials Found in Buildings (cont)
Table B-4. Typical Building Materials Comprising a Toxicity Characteristic Leaching Procedure
Table B-5. Decision Tree
Figure B-1: Paint Sampling Form
Figure B-2: Lead Soil Sampling Form
Figure B-3: Asbestos Sampling Form
Figure B-4: Example Chain of Custody Form
Figure B-5: Example Asbestos Data Summary Sheet