CURRENT CONDITIONS/PROJECT WORK PLAN
2.1.1
Background Data
[Prior to commencing the sampling activities, the Contractor shall review the available
information regarding the facility characteristics and use patterns, as described in Paragraph
1.3.2, relevant to identification of lead containing paint and ACM in the facilities that will be
surveyed.]
2.1.2
Facility floor plans/sketches identifying the building locations and that contain detailed drawings
identifying the specific building areas incorporating the survey project boundaries are [provided
in CADD format and] attached to this SOW. The Contractor shall use the [CADD] floor p lans,
sketches, and drawings when performing Task 2 in order to identify and record all lead/asbestos
samples and potential hazardous debris and waste stream areas of the buildings that will be
impacted by the planned project.
2.1.3
Preliminary Site Visit/Walkover
The Contractor shall conduct a preliminary site visit/walkover in order to verify building access
and the information provided.
2.1.4
Project Work Plan
The Contractor shall prepare a project work plan after the preliminary site visit/walkover and
a preliminary review of this SOW that addresses the project requirements as follows: Project
work tasks/description of work including recommended changes following preliminary
project review including the [CADD] floor plans, sketches and drawings provided, and the
walkover.
Accident Prevention Plan.
Sampling Plan including strategy and analytical procedures that will be followed.
Identification and qualifications of each laboratory that will be used to analyze lead/asbestos
samples.
Identification and qua lifications of the Contractor's personnel performing the survey.
2.2
CONDUCT LEAD/ASBESTOS SURVEY
A visual examination of the future project site shall be performed for lead substrates, ACM
identification, and the sample location documentation. The samp ling shall be performed
concurrently during one walkthrough, eliminating the need for gaining access more than once to
the project work area that is described in the Description of Work. Information gathered in the
visual examination affecting the decisio ns to be made in the Survey Report not addressed on
A-10