Home
Download PDF
Order CD-ROM
Order in Print
Home
>
USACE Engineering Pamphlets CD 2 - index
>
> EP 1110-2-9
Chapter 1. Introduction - EP-1110-2-90005
Chapter 2. The Hydrologic Engineering Management Plan
Figure 1. Sequence of hydrologic planning activities for Civil Works studies
Chapter 3. Scoping the Investigation
Figure 2. Sequence of hydrologic planning activities for continuing authority studies
Key Items to Evaluate
Major Hydrologic Engineering Activities Required
Water supply investigations.
Chapter 4. Development of an Initial HEMP
Figure 3. Hydrologic study design
Initial HEMP Preparation
Chapter 4. Development of a Detailed HEMP
Appendix A. References - EP-1110-2-90017
Appendix B. List of Acronyms
Appendix B. List of Acronyms (cont)
Appendix C. Initial Hydrologic Engineering Management Plan (HEMP) for a Flood Damage Reduction Feasibility Study
Levee and Channel Alternative Evaluation
Hydraulic Studies - EP-1110-2-90022
Appendix D. Generic Detailed Hydrologic Engineering Management Plan (HEMP) for a Flood Damage Reduction Study
Development of Basin Model (HEC-1)
Hydraulic Studies - EP-1110-2-90025
Calibration of Models to Historic Events
Future Without-Project Analysis
Hydraulic Design
Hydrologic Engineering Reporting Requirements
Appendix E. Generic Detailed Hydrologic Engineering Management Plan (HEMP) for a Water Control Management Study
Develop Forecasting Model
Develop a Plan for the Water Control Data System (WCDS) and the WCDS Master Plan
Develop Flood Control Operation Guidance
Develop Drought Contingency Plan
Prepare outline of manual
Appendix F. Generic Detailed Hydrologic Engineering Management Plan (HEMP) for a Water Supply Investigation
Process hydrologic data for model input
Preliminary Analysis
Prepare river system characteristics
Alternative Evaluations
EP 1110-2-9