(e) Adjust model characteristics as necessary until
(3) Verify total basin model by simulating historic
records and comparing with observed data.
(4) Power generation.
F-6. Alternative Evaluations
(a) Firm energy.
This task is the "heart" of the water control management
(b) Average energy.
study, requiring repeated simulations with nominated
alternatives of reservoir operating policies and procedures.
(c) Capacity.
It would be performed in close coordination with the
interdisciplinary planning team. Alternatives may have
c. Repeat with alternatives; perform sensitivity tests
been suggested by the prescriptive model, if used, or by
as necessary.
the team's agreed-upon formulations.
d. Prepare model results for briefings, public meet-
a. Define nominated alternative; prepare operating
ings, etc., as necessary.
rule curve or other criteria accordingly.
e. Document results.
b. Execute model; display and examine results.
(1) Seasonal reservoir elevations - number of refill
F-5