ASBESTOS SURVEYS AND ASSESSMENTS STANDARD SCOPE OF WORK
PROJECT OVERVIEW, OBJECTIVES, AND DESCRIPTION OF WORK - EP-1110-1-220005
Other Organizations - EP-1110-1-220006
REGULATORY REQUIREMENTS - EP-1110-1-220007
SITE CHARACTERISTICS, OBJECTIVES AND DESCRIPTION OF WORK - EP-1110-1-220008
PROJECT REQUIREMENTS - EP-1110-1-220009
Project Boundaries Identification/Floor Plans - EP-1110-1-220010
TASK 2 CONDUCT SURVEY AND ASSESSMENT
Collection of Bulk Samples
TASK 3 SAMPLE DATA ANALYSIS, EVALUATION OF FINDINGS - EP-1110-1-220013
Laboratory Turnaround Time
TASK 4 Asbestos Survey and Assessment Report
Contractor Data Certification - EP-1110-1-220016
Update Installation Management Plan - EP-1110-1-220017
Contractor Inspector and Management Planner Qualifications
Contracted Laboratory Qualifications
Government Quality Control Oversight and Support
SCHEDULES
MISCELLANEOUS - EP-1110-1-220022
Appendix B. THE INSTALLATION ASBESTOS SURVEY AND ASSESSMENT
Organizing and Conducting the Installation Asbestos Survey
Figure B-1. Asbestos Survey Flowchart
Conducting site inspections.
Guide for Completing the Asbestos-Containing Material Assessment
Physical damage.
The following asbestos report format should be used:
Table B-1. Determination of an Assessment Index
Factors Used in the Assessment Process
Exposure Analysis
Management Considerations
Miscellaneous considerations.
Appendix C. ARMY ASBESTOS - CONTAINING MATERIAL CHECKLIST
Part I: Damage Assessment.
Percent asbestos
Air stream/plenum.
For occupied facilities only.
EP 1110-1-22