EP 1110-1-22
15 Sep 00
in completing the activities required by this SOW. [Insert applicable references.]]
1.3
SITE CHARACTERISTICS, OBJECTIVES AND DESCRIPTION OF WORK
1.3.1
Site Location/Characteristics
*******************************************************************************
NOTE: Consult the installation POC to obtain site location information including
installation and building designations or addresses, and other appropriate location
information for all facilities and areas to be included in the survey. Include details
regarding the number of facilities and their sizes to be included in the asbestos
surveys and assessments.
*******************************************************************************
The survey shall address the following facilities at the following locations:
[Insert installation and building designations or addresses, and other appropriate location
information for all structures, facilities/units and areas to be included in the survey.]
1.3.2
Previous Studies and Results
[Prior to initiating field activities required by this SOW, the Contractor shall review the previous
study data results collected at the location(s) identified in Paragraph 1.3.1 and provided as an
attachment to this SOW.]
1.3.3
Project Objectives and Description of Work
The project objectives are: [insert text as applicable]. The Contractor shall conduct asbestos
surveys and assessments at the structures, facilities/units and areas listed in this SOW. The
asbestos survey shall identify the location and estimate the quantities of Asbestos Containing
Materials (ACM) that must be removed or managed in place for the structure(s), facilities(s)/units
and areas listed above. An asbestos assessment shall further evaluate the potential for ACM
identified to become airborne and cause potential human exposure. Procedures and requirements
for completing the asbestos survey and assessment are defined in the paragraphs that follow.
1.3.4
Data Quality Objectives (DQOs)
*******************************************************************************
NOTE: Project-specific DQOs must be developed in keeping with installation-
specific factors and requirements and followed to provide project required data
quality.
*******************************************************************************
The Contractor shall meet the project-specific Data Quality Objectives (see Glossary) for the
sampling, analysis and Quality Assurance/Quality Control (QA/QC) defined in Paragraphs 2.2 and
2.3. The DQOs include collection of the proper numbers and types of samples, the appropriate
sample collection and analytical methodologies, the field and laboratory QA/QC procedures, and
the data validation and evaluation processes in order to provide required data quality. The
A-6