EP 1110-1-22
15 Sep 00
Establish Preliminary
Do Any
Yes
Priority Listing Based on
Records Exist?
Available Records
No
Are There
Yes
Suspect Buildings Based
Highly Suspect
on Priority Values
Buildings?
No
Has a Visual
Are Suspected
Yes
Yes
Survey Been
Buildings
Done?
Indicated?
No
Do Other Sources
Yes
Indicate Suspect
for Suspect Buildings
Buildings?
Based on Priority Values
No
Buildings Based on Relative
Importance or Priority
Values
1.
Organize ACM by
Location in Building
Initiate the
2.
Categorize ACM as:
Prepare Complete Building
Building
Surfacing Material
Inspection Priority List:
Inspection
Pipe, Boilder, or Tank
Highly Suspect, Suspect,
Insulation "Other"
and Nonsuspect
ACM
Figure B-1. Asbestos Survey Flowchart
B-3