EP 1110-1-22
15 Sep 00
sampling data collected shall be compared to action levels defining asbestos hazards provided in
this SOW.
1.3.5
Bid Assumptions
*******************************************************************************
NOTE: Include project-specific assumptions for the Contractor to use in
developing a cost estimate. Contact the installation POC for site-specific
information to assist in the development of realistic assumptions. For example,
floor plans may accompany the SOW to give the Contractor an understanding of the
level of effort required to survey each facility. Typical analysis cost per sample can
range from to .50 for PLM and to for TEM. Check with several labs
in the area of the project on sample costs and procedures. Also assume the QC
samples will equal 5% to 10% of total samples analyzed.
*******************************************************************************
Bid assumptions include: [insert bid parameters]
2.0
PROJECT REQUIREMENTS
2.1
TASK 1 DESCRIPTION OF CURRENT CONDITIONS/PROJECT WORK PLAN
*******************************************************************************
NOTE: Determine the need for the Contractor to review the installations Asbestos
Management Program and provide a copy if required.
*******************************************************************************
The Contractor shall coordinate with the COTR and the installation POC to obtain any useful
information describing current conditions of the facilities that will be included in the surveys and
assessments. This shall include information concerning facility construction, maintenance, and
management history, and any useful information from previously conducted asbestos surveys and
assessments.
2.1.1
Background Data
The Contractor shall review general facility information [and summarize the results of any
previous surveys or analyses] that established the possible presence of ACM to be investigated
under this SOW.
2.1.1.1
Asbestos Management Program
[The Contractor shall review the installation's Asbestos Management Program.]
2.1.1.2
Interviews
[The Contractor shall conduct interviews of personnel familiar with the facility history and
maintenance patterns. Personnel to be interviewed shall include:
a. Installation Asbestos Management Team Leader
b. Installation Environmental Officer to review preexisting data and verify
maintenance histories
A-7