Home
Download PDF
Order CD-ROM
Order in Print
Home
>
USACE Engineering Pamphlets CD 2 - index
>
> EP 1120-2-520
NAVIGATION AND DREDGING OPERATIONS AND MAINTENANCE GUIDANCE AND PROCEDURES
CHAPTER 1 - INTRODUCTION - EP-1120-2-5200006
Hazardous Waters.
CHAPTER 2 - AIDS TO NAVIGATION, NAVIGATION CHARTS, AND RELATED DATA
USCG District Aids to Navigation Office
Cooperation with Coast Guard.
Colors of Dredging Buoys Established by USACE.
Channel survey drawings furnished to the USCG are to include:
Special Reports.
Charted features.
Chart Standards.
Corrections/Revisions.
Information Pamphlets, Maps, Brochures and Other Material.
CHAPTER 3 - PROTECTION OF PUBLIC HEALTH AND SAFETY AT JETTIES, GROINS, AND BREAKWATERS
Program Implementation.
CHAPTER 4 - REMOVAL OF WRECKS AND OTHER OBSTRUCTIONS
Guidance
Abandonment issues.
Coordination with Coast Guard.
Corps assistance with marking
Notifications/Reports.
Legal Actions.
CHAPTER 5 - WATERBORNE COMMERCE STATISTICS
Enforcement of Reporting Policy
Data Collection and Reports.
Vessels idle during the month must also be reported.
Towboat Reporting.
NAME AND NUMBER OF VESSEL
ALTERNATE CHANNELS
CONTAINERS AND CONTAINERIZED CARGO
HARBOR MAINTENANCE TAX INFORMATION
NET REGISTERED TONNAGE
Violation Procedures.
Release Statement
Approval Required to Add, Modify, or Delete Tables from the Waterborne Commerce of the United States
CHAPTER 6 - LOCK PERFORMANCE MONITORING SYSTEM
CHAPTER 7 - OPERATIONS AND MAINTENANCE UNIFORM PROGRAM
Guidance - Uniform Procurement.
Uniforms will be kept clean and neat.
CHAPTER 8 - DREDGING
Dredging Contracts
Unit Price Contracts - Area Measure.
Navigation Channel Conditions.
Survey Time Constraints.
Corps of Engineers Reserve Fleet
Small Business Dredging Program
Plant Operations Reports (Reports Control Symbol ENG CW-O-13).
CHAPTER 9 - CONVENTION ON THE PREVENTION OF MARINE POLLUTION BY DUMPING OF WASTES AND OTHER MATTER - DREDGED MATERIAL OCEAN DISPOSAL
CHAPTER 10 - RESTRICTED AREAS FOR HAZARDOUS WATERS AT DAMS AND OTHER CIVIL WORKS STRUCTURES
Implementation.
Appendix A. REFERENCES - EP-1120-2-5200055
Appendix A. REFERENCES (cont) - EP-1120-2-5200056
Appendix A. REFERENCES (cont) - EP-1120-2-5200057
Appendix B. ENG FORM 4020-R
Appendix C. ENG FORM 4021-R
Appendix D. MAILING ADDRESSES
Appendix E. SPECIAL REPORTS MATRIX
Appendix E. SPECIAL REPORTS MATRIX (cont)
Appendix F. SAMPLE NOTICE TO NAVIGATION INTERESTS
Appendix G. CHART SYMBOLS
Buildings and Structures
Appendix H. SAMPLE CHART DETAIL
Appendix I. SAMPLE PROFILE DRAWINGS
Interstate HWY 540 Bridge
Lock and Dam No. 9
Appendix J. USCG DISTRICT OFFICES (AS OF 6/95)
Appendix K. SAMPLE LETTER: NOTIFICATION OF CORPS REMOVAL
Appendix L. SAMPLE LETTER: ACKNOWLEDGMENT OF ABANDONMENT
Appendix M. SAMPLE LETTER: OWNER DUTY TO MARK/REMOVE
Appendix N. SAMPLE LETTER: BILL FOR REIMBURSEMENT
Appendix O. DEFINITION OF TERMS
Navigable Waters.
Traffic Direction
Vessel - Commercial.
Appendix P. CODING PROCEDURES
Location and Dock Codes
Administrative Forms.
Appendix Q. COMPILATION OF NAVIGATION STATISTICS
Computation of Ton-miles.
Appendix R. REPORTING OFFENSES AND VIOLATIONS
Appendix S. CLASS A DRESS UNIFORM
Floating Plant Personnel Uniform Items.
Table 2. Uniform Items - Dress Uniform Floating Plant Personnel
Appendix T. CLASS B DUTY UNIFORM
Summary of Items.
Floating Plant O&M Personnel Uniform Items.
Table 4. Uniform Items for Duty Uniform Floating Plant Personnel
Appendix U. CLASS C WORK UNIFORM
Sweatshirt. Navy blue with hood.
Appendix V. MATERNITY UNIFORM ITEMS
Lock Operations and Maintenance Personnel and Floating Plant Personnel Class T3 Maternity Duty Uniforms.
Appendix W. UNIFORM PATCHES AND INSIGNIA
Procurement of Patches and Insignia.
Lock Operations and Maintenance Personnel and Floating Plant Personnel Uniform Patches and Insignia Items.
Cloth Marine Shoulder Patch (#5)
Appendix X. UNIFORM ALLOWANCES
Items Not Covered by the Uniform Allowance.
Appendix Y. Dredging Diagrams
Figure 2. - EP-1120-2-5200103
Figure 3. Advance Maintenance Concept
Appendix Z. CERF GUIDELINES
Required Contract Provision.
Responsibilities. - EP-1120-2-5200107
Limitations of the BOA.
Appendix AA. DETERMINATION OF THE HYDRAULIC LINE
Downstream of Structures.
Appendix AB. OPERATIONAL CONSIDERATIONS
Appendix AB. OPERATIONAL CONSIDERATIONS (cont)
EP 1120-2-520