coordinate unit access procedures.
c. Director of Public Works - to discuss assessment logistics, e.g., access and
assessment scheduling
d. [The Safety Officer]
e. [Installation Medical Authority to review the Childhood Lead Poisoning
Prevention Program (CLPP Program)]
f. [The Chief of Housing to coordinate assessment logistics including occupant
access and notification procedures]
g. [Any team members of the BRAC team to consider any requirements that may be
imposed for property transfer. This might include report format, transmission of data, use of
local subcontractors, etc.]
2.1.1.3
Summary of Preexisting Data, [Lead Hazard Management Plan] and Interviews
[The Contractor shall complete a project deliverable as an attachment to the Project Work Plan
that summarizes the review of preexisting data, [the Lead Hazard Management Plan] and
interviews for the units to be assessed, based on the information provided and addressed above.
The summary shall address the following:
A brief summary of the reliability of data from previous studies.
b. Lead Hazard Management Plan
[A brief description of the Installation's Lead Hazard Management Plan and summary of
information pertinent to the Lead Inspection/Risk Assessment to be performed including any
previous lead-based paint identification data, and maintenance history and practices.]
c. Interviews
A brief summary of the interviews and the conclusions reached.]
2.1.2
*****************************************************************************
NOTE: If digital site maps and floor plans for each type of unit are not available, the
SOW editor may wish to have the contractor prepare Computer Assisted Design and
A-13