EP 1110-1-31
31 Aug 01
The Contractor shall conduct all work in accordance with the following Federal, state, and local
regulations and requirements. Where inconsistencies exist between the requirements and this
Scope of Work (SOW), the Contractor shall use the most protective.
1.2.1.1
Federal Requirements
a. Lead Inspection/Risk Assessment Procedures and Requirements.
The Contractor shall comply with 24 CFR 35 Subparts B, C and R; and 40 CFR 745 Subpart D
and L (as amended) in meeting the requirements of this SOW. Referenced methodologies in
Lead-Based Paint Guidelines for Disposal of Department of Defense Residential Real Property-
A Field Guide, the Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in
Housing, HUD, June 1995 (Chapter 7 Revision, 1997) shall be used where applicable. Lead
hazards shall be identified based on "Lead; Identification of Dangerous Levels of Lead"; 40
CFR 745 Final Rule, 66 FR 1206, 5 January 2001. The Contractor shall comply with DA Public
Works Technical Bulletin 420-70-2, Installation Lead Hazard Management regarding use of DA
Hazardous Asbestos and Lead Optimal Management System (HALO) (See Glossary).
b. Health and Safety Requirements
The Contractor shall comply with applicable OSHA standards and with the USACE Safety and
Health Requirements Manual, EM 385-1-1, to include the submission of an Accident Prevention
Plan (APP) to the Contracting Officer (See Glossary) prior to performing field activities. Field
activities shall not begin without acceptance of the APP.
1.2.1.2
State and Local Requirements
******************************************************************************
NOTE: Reference state, local, (and OCONUS if applicable) or installation-specific
requirements that differ from the federal requirements cited above that are applicable to
the work addressed in this SOW.
******************************************************************************
[The Contractor shall comply with the following state [and local] [and installation] requirements
in completing the activities required by this SOW. [Insert applicable references]]
1.3
SITE CHARACTERISTICS, OBJECTIVES AND DESCRIPTION OF WORK
1.3.1
Site Location/Characteristics and Occupant Use Patterns
******************************************************************************
NOTE: Identify the target housing/child-occupied facilities to be addressed in the
combined inspection/risk assessment on a unit-by-unit basis. Provide site location
A-8