EP 1110-1-31
31 Aug 01
3.1.2.7
Project Manager Experience
The project manager shall have a minimum of three years experience in managing lead
inspections and risk assessments. A resume or other description of the project manager's
experience that is directly applicable to the activities required under this SOW shall be provided
as a part of the Project Work Plan.
3.1.3
Contracted Laboratory Qualifications
The Contractor shall provide as a part of the Project Work Plan evidence of current NLLAP
recognition for each laboratory used for either preparation or analysis of samples taken for this
assessment. The evidence of NLLAP recognition shall include certifications for each sample
matrix analyzed. The laboratory conducting any worker exposure air sample analysis shall be
accredited by the AIHA and shall be a current successful passing participant in the AIHA's
Proficiency Analytical Testing (PAT) Program for analyte sampled.
3.1.4
Contractor Errors and Omissions Liability Insurance
******************************************************************************
NOTE: Consult with the Contracting Officer to develop requirements for Contractor
errors and omissions liability insurance that are appropriate for the scope of the project.
******************************************************************************
The Contractor shall provide documentation to the Contracting Officer that the Contractor is
currently covered by an errors and omissions liability insurance policy. [Insert errors and
omissions text as appropriate]
3.2
PROJECT RECORDS
3.2.1
Record keeping Requirements
******************************************************************************
NOTE: EPA regulations (40 CFR 745.227(h)) require that lead-hazard risk assessment
reports be retained for a minimum of three years. State, local, or installation regulations
may require a longer retention period. Include the applicable retention period in the
SOW requirements below.
******************************************************************************
The Contractor shall maintain records related to the lead inspection/risk assessment for at least
[insert appropriate number of years] years following comp letion of the assessment(s) outlined
under this SOW. Records shall include:
A-36