required default values. The dictionary is part of the HALO program and can be obtained
through the installation, or by contacting CEERD CF-M. If the transferee is known,
consult them for reporting requirements. In every case, electronic archives should be
produced for the record.
******************************************************************************
The Contractor shall provide laboratory data to the Contracting Officer in both hard copy and
electronic format. The electronic data report shall be provided in [HALO format] [insert other
data management system as applicable] with the capability of being downloaded into the
[Installation's] electronic data management system.
2.4.6
Update Installation Management Plan
******************************************************************************
NOTE: Since this is for property transfer, select the most efficient method of reporting
that meets the transfer requirements and preserves the record. If the installation does not
have a Lead Hazard Management Program, it would probably be best to specify the
HALO Program as the reporting system. If the Installation has a Lead Hazard
Management Plan, it is probably best to update it to the requirements of this SOW.
Consult with the transferee (if known) to determine the scope of this task (e.g., whether to
limit the task to entry of new data into the appropriate electronic format, to include an
update of a hard copy document, or to deliver an addendum to the existing installation
plan).
******************************************************************************
[After entering the assessment data into HALO, the Contractor shall run the installation
management program to generate an updated installation lead hazard management program.]
[The Contractor shall update the installation lead hazard management plan.]
2.4.7
Comparison of Contractor Findings to Installation HALO Findings
[The Contractor shall include a comparison of the lead inspector/risk assessor findings and
recommendations with those generated by HALO.]
2.4.8
Contractor Conclusions and Recommendations
The report shall separate housing constructed prior to 1960 from housing constructed from 1960
through the end of 1977. For housing constructed during these time periods the contractor shall
use Table B-2 (Appendix B) in developing conclusions and control recommendations. The
report shall contain the Contractor's conclusions and lead hazard control recommendations.
[Where the lead inspector/risk assessor's findings and recommendations differ from those
A-32