EP 1110-1-19
30 Jun 01
Exhibit 6-7, cont.
Example HCAS Data Report and WBS Cost Breakdown
WBS Number
DESCRIPTION
QTY UOM
UNIT
COST
COST
$
331XX 13
29
In-Situ Steam Extraction
MGA
13
30
Filter Presses
MGA
13
31
Lignin Adsorption/Sorptive Clays
CY
13
32
Air Sparging
MGA
13
50
Construction of Permanent Plant Facility
EA
13
9x
Other (Use Numbers 90-99)
14
THERMAL TREATMENT
14
01
Incineration
CY
14
02
Low Temperature Thermal Desorption
CY
14
03
Supercritical Water Oxidation
MGA
14
04
Molten Salt Destruction
CY
14
05
CY
14
06
Solar Detoxification
CY
14
07
High Temperature Thermal Desorption
CY
14
50
Construction of Permanent Plant Facility
EA
14
9x
Other (Use Numbers 90-99)
15
STABILIZATION/FIXATION/ENCAPSULATION
15
01
Molten Glass
CY
15
02
In-Situ Vitrification
CY
15
03
In-Situ Pozzolan Process (Lime/Portland Cement)
CY
15
04
Pozzolan Process (Lime/Portland Cement)
CY
15
05
Asphalt-Based Encapsulation
CY
15
06
Radioactive Waste Solidification (Grouting/Other)
CY
15
07
Sludge Stabilization (Aggregate/Rock/Slag)
CY
15
50
Construction of Permanent Plant Facility
EA
15
9x
Other (Use Numbers 90-99)
16
RESERVED FOR FUTURE USE
17
DECONTAMINATION AND DECOMMISSIONING (D&D)
17
01
Pre-Decommissioning Operations
SF
17
02
Facility Shutdown Activities
SF
17
03
Procurement of Equipment and Material
SF
17
04
Dismantling Activities
SF
17
05
Research and Development (R&D)
SF
17
06
Spent Fuel Handling
SF
17
07
Hot Cell Cleanup
SF
17
9x
Other (Use Numbers 90-99)
18
DISPOSAL (OTHER THAN COMMERCIAL)
18
01
Landfill/Burial Ground/Trench/Pits
CY
18
02
Above-Ground Vault
CY
18
03
Underground Vault
CY
18
04
Underground Mine/Shaft
CY
18
05
Tanks
MGA
6-25