EP 1110-1-19
30 Jun 01
Exhibit 6-7, cont.
Example HCAS Data Report and WBS Cost Breakdown
WBS Number
DESCRIPTION
QTY UOM
UNIT
COST
COST
$
331XX 03 14
Fuel Storage Tanks (New)
EA
03 9X
Other (Use Numbers 90-99)
04
ORDNANCE AND EXPLOSIVE - CHEMICAL WARFARE
04 01
Ordnance Removal and Destruction
ACR
04 9x
Other (Use Numbers 90-99)
05
SURFACE WATER COLLECTION AND CONTROL
05
01
Berms/Dikes
LF
05
02
SF
Floodwalls
05
03
Levees
LF
05
04
Terraces and Benches
LF
05
05
Channels/Waterways (Soil/Rock)
LF
05
06
Chutes or Flumes
LF
05
07
Sediment Barriers
LF
05
08
LF
05
09
Lagoons/Basins/Tanks/Dikes/Pump System
ACR
Pumping/Draining/Collection
MGA
05
10
05
11
Transport to Treatment Plant
MGA
05
12
Earthwork
CY
05
13
Erosion Control
ACR
05
14
Development of Borrow Pit/Haul Roads
ACR
05
9X
Other (Use Numbers 90-99)
06
06
01
Extraction and Injection Wells
EA
06
02
LF
06
03
Slurry Walls
SF
06
04
Grout Curtain
SF
Sheet Piling
SF
06
05
06
06
Lagoons/Basins/Tanks/Dikes/Pump System
ACR
06
07
Pumping/Collection
MGA
06
08
Transport to Treatment Plant
MGA
06
09
Development of Borrow Pit/Haul Roads
ACR
06
9x
Other (Use Numbers 90-99)
07
07
01
Gas/Vapor Collection Trench System
LF
07
02
Gas/Vapor Collection Well System
EA
07
03
Gas/Vapor Collection at Lagoon Cover
SY
Fugitive Dust/Vapor/Gas Emissions Control
ACR
07
04
07
9x
Other (Use Numbers 90-99)
08
SOLIDS COLLECTION AND CONTAINMENT
0.95
7,695
8,100 CY
08 01
Contaminated Soil Collection
08 02
Waste Containment, Portable (Furnish/Fill)
CY
08 03
Transport to Treatment Plant
CY
6-22