EP 1110-1-19
30 Jun 01
Exhibit 6-7, cont.
Example HCAS Data Report and WBS Cost Breakdown
WBS Number
DESCRIPTION
QTY
UOM
UNIT
COST
COST
$
342XX 05
08
LF/YR
05
09
Lagoons/Basins/Tanks/Dikes/Pump System
ACR/YR
05
10
Pumping/Draining/Collection
MGA
05
11
Transport to Treatment Plant
MGA
05
13
Erosion Control
ACR/YR
05
9X
Other (Use Numbers 90-99)
06
06
01
Extraction and Injection Wells
EA/YR
06
02
LF/YR
06
03
Slurry Walls
SF/YR
06
04
Grout Curtain
SF/YR
06
05
Sheet Piling
SF/YR
06
06
Lagoons/Basins/Tanks/Dikes/Pump System
ACR/YR
06
07
Pumping/Collection
MGA
06
08
Transport to Treatment Plant
MGA
06
9x
Other (Use Numbers 90-99)
07
07
01
Gas/Vapor Collection Trench System
LF/YR
07
02
Gas/Vapor Collection Well System
EA/YR
07
03
Gas/Vapor Collection at Lagoon Cover
SY/YR
07
04
Fugitive Dust/Vapor/Gas Emissions Control
ACR/YR
07
9x
Other (Use Numbers 90-99)
08
SOLIDS COLLECTION AND CONTAINMENT
08
01
Contaminated Soil Collection
CY
08
02
Waste Containment, Portable (Furnish/Fill)
CY
08
03
Transport to Treatment Plant
CY
08
04
Radioactive Specific Waste Containment (Furnish/Fill)
CY
08
05
Capping of Contaminated Area/Waste Pile (Soil/Asph
ACR/YR
08
06
Nuclear Waste Densification (Dynamic Compaction)
CY
08
9x
Other (Use Numbers 90-99)
09
LIQUIDS/SEDIMENTS/SLUDGES COLLECTION AND
CONTAINMENT
09
01
Dredging/Excavating
CY
09
02
Industrial Vacuuming
CY
09
03
Waste Containment, Portable (Furnish/Fill)
MGA
09
04
Transport to Treatment Plant
MGA
09
05
Radioactive Specific Waste Containment (Furnish/Fill)
MGA
09
06
Pumping/Draining/Collection
MGA
09
07
Lagoons/Basins/Tanks/Dikes/Pump System
ACR/YR