Example HCAS Data Report and WBS Cost Breakdown
WBS Number
DESCRIPTION
QTY
UOM
UNIT
COST
COST
$
342XX 13
05
MGA
13
06
MGA
13
07
Air Stripping
MGA
13
08
Steam Stripping
MGA
13
09
Soil Washing (Surfactant/Solvent)
CY
13
10
Soil Flushing (Surfactant/Solvent)
CY
13
11
Solids Dewatering
CY
13
12
Oil/Water Separation
MGA
13
13
Dissolved Air Floatation
MGA
13
14
Heavy Media Separation
CY
13
15
Distillation
MGA
13
16
Chelation
MGA
13
17
Solvent Extraction
MGA
13
18
Supercritical Extraction
MGA
13
19
Carbon Adsorption - Gases
CF
13
20
Carbon Adsorption - Liquids
MGA
13
21
Membrane Separation - Reverse Osmosis
MGA
13
22
Membrane Separation - Electrodialysis
MGA
13
23
Soil Vapor Extraction
CY
13
24
Shredding
CY
13
25
Aeration
CY
13
26
Advanced Electrical Reactor
CY
13
27
Low Level Waste (LLW) Compaction
CY
13
28
Agglomeration
CY
13
29
In-Situ Steam Extraction
MGA
13
30
Filter Presses
MGA
13
31
Lignin Adsorption/Sorptive Clays
CY
13
32
Air Sparging
MGA
13
50
Post Construction O&M of Permanent Plant Facility
EA/YR
13
9x
Other (Use Numbers 90-99)
14
THERMAL TREATMENT
14
01
Incineration
CY
14
02
Low Temperature Thermal Desorption
CY
14
03
Supercritical Water Oxidation
MGA
14
04
Molten Salt Destruction
CY
14
05
CY
14
06
Solar Detoxification
CY
14
07
High Temperature Thermal Desorption
CY
14
50
Post Construction O&M of Permanent Plant Facility
EA/YR
14
9x
Other (Use Numbers 90-99)
15
STABILIZATION/FIXATION/ENCAPSULATION
15 01
Molten Glass
CY