EP 1165-2-1
30 Jul 99
Table 2-1 Continuing Authority Projects
______________________________________________________________________
__
Statutory Limit
of Federal Costs
Authority
Type of Project for Which Used
Per Project (2)
Section 14
Streambank and Shoreline
||content||
,000,000
1946 FC Act(1)
Protection for Public
Facilities
Section 103
Small Beach Erosion Control
2,000,000(3)
1962 R&H Act(1)
Projects
Section 107
Small Navigation Projects
4,000,000(4)
1960 R&H Act(1)
Section 111
2,000,000(3)(5)
1968 R&H Act(1)
to Federal Navigation
Projects
Section 204
Projects for Protection,
None
1992 WRDA
Restoration, and Creation of
Aquatic and Ecologically Related
Habitats, including Wetlands
in Connection with Dredging)
Section 205
Small Flood Control Projects
5,000,000
1948 FC Act(1)
Section 206
Aquatic Ecosystem Restoration
5,000,000
1996 WRDA
Projects
Section 208
Snagging and Clearing for Flood
500,000
1954 FC Act(1)
Control
Section 1135
Project Modifications for
5,000,000
1986 WRDA(1)
Improvement of the Environment
______________________________________________________________________
(1)
As subsequently amended.
(2) Implementation, includes all Federal expenditures, including
preauthorization study costs.
(3) Includes actual costs for subsequent periodic nourishment, if
part of the adopted project, as well as for initial implementation.
(4) Also, the Federal share of total costs (initial implementation
costs plus the capitalized value of future maintenance costs) may not
exceed 2.25 times the initial Federal costs or .5 million, whichever
is greater.
(5) A project involving Federal costs in excess of million will be
transmitted to Congress for specific authorization.
______________________________________________________________________
2-2