EP 1130-2-510
13 Dec 96
(1) The report shall specify:
(b) Revenues received by the United States from the sale of electricity;
(c) Costs of construction, operation, and maintenance allocated to power; and
(d) Balance owed to the US Treasury by the Power Marketing Administration.
(2) Submission Dates. The report is due to the Congress by the 15th of January each year.
The field operating activities will submit to CECW-OM their data by 15 December each year.
b. Service Rates for Generating Equipment.
(1) Each year, on a fiscal year basis, districts having multi-purpose projects with
hydropower will determine and report the rates listed below for each hydroelectric project. These
rates will be composite for each project, based on the total main unit hours in each category for all
units at the project, and computed as indicated in Appendix B.
In-service operating rate.
Generator scheduled outage rate.
Standby rate.
Non-generator scheduled outage
rate.
Availability rate.
Planned modification outage rate.
Generator forced outage rate.
rate.
Generator delayed forced outage
rate.
(2) Service Rate Reports.
(a) Each MSC shall furnish annual reports to HQUSACE (CECW-OM) by 15 February
(RCS CECW-0-34) for the previous fiscal year utilizing the Lotus 1-2-3 format provided as ENG
Form 4338-E (AUG 89), illustrated in Appendix C. The reports shall be submitted using a
diskette or electronic mail.
(b) The additional information shown in Appendix D shall be furnished as a MSC
summary report along with an individual summary report for each district having hydroelectric
power facilities.
c. Equipment Failure and Generation Interruption Reports.
(1) Project Managers shall report all power generating equipment failures and generation
interruptions anticipated to cost in excess of ,000, or require more than five working days to
return equipment to service, to CECW-OM immediately by telephone, facsimile machine (FAX),
2-2