EP 1110-1-28
31 Aug 01
2.3.6
Project Data Presentation
The Contractor shall provide the project data to the Contracting Officer in both a written laboratory
report and an electronic format [HALO] [insert other data management system as applicable].
2.3.6.1
Laboratory Report
The Contractor shall require the laboratory to provide the information necessary for the Contractor to
comply with the data evaluation/validation procedures outlined in this SOW. This shall be included in a
data package containing the following information:
Cover page information including methods, dates, instruments, digestions, and signature of
the laboratory director.
Sample information including identification and results for blanks, QC samples, samples,
dilution factors, and batch identification.
Results of initial precision and accuracy runs.
Results of calibration, including sources of standards and detection limits.
Results of blanks, including type of blank, and any corrections used.
Results of tests for precision and accuracy.
Results of standard sample analysis to 95% confidence intervals which contain
concentrations of lead that correspond to a given action level.
2.4
TASK 4 RISK ASSESSMENT REPORT
******************************************************************************
NOTE: 40 CFR 745.227(h) requires that risk assessment reports be retained
for a minimum of three years. State, local, or installation regulations may
require a longer retention period.
******************************************************************************
The Contractor shall prepare a Risk Assessment Report containing the elements described below.
2.4.1
General Report Contents
In addition to the information described in Paragraphs 2.4.2 through 2.4.10 below, the assessment
report shall include:
Date of [each] assessment
Address of [each] building
Unit number