WBS Number
DESCRIPTION
QTY UOM UNIT
COST
COST
$
MGA
331XX 13
29
In-Situ Steam Extraction
MGA
13
30
Filter Presses
CY
13
31
Lignin Adsorption/Sorptive Clays
MGA
13
32
Air Sparging
EA
13
50
Construction of Permanent Plant Facility
13
9x
Other (Use Numbers 90-99)
14
THERMAL TREATMENT
CY
14
01
Incineration
CY
14
02
Low Temperature Thermal Desorption
MGA
14
03
Supercritical Water Oxidation
CY
14
04
Molten Salt Destruction
CY
14
05
CY
14
06
Solar Detoxification
CY
14
07
High Temperature Thermal Desorption
EA
14
50
Construction of Permanent Plant Facility
14
9x
Other (Use Numbers 90-99)
STABILIZATION/FIXATION/ENCAPSULATION
15
CY
15
01
Molten Glass
CY
15
02
In-Situ Vitrification
CY
15
03
In-Situ Pozzolan Process (Lime/Portland Cement)
CY
15
04
Pozzolan Process (Lime/Portland Cement)
CY
15
05
Asphalt-Based Encapsulation
CY
15
06
Radioactive Waste Solidification (Grouting/Other)
CY
15
07
Sludge Stabilization (Aggregate/Rock/Slag)
EA
15
50
Construction of Permanent Plant Facility
15
9x
Other (Use Numbers 90-99)
16
RESERVED FOR FUTURE USE
DECONTAMINATION AND DECOMMISSIONING (D&D)
17
SF
17
01
Pre-Decommissioning Operations
SF
17
02
Facility Shutdown Activities
SF
17
03
Procurement of Equipment and Material
SF
17
04
Dismantling Activities
SF
17
05
Research and Development (R&D)
SF
17
06
Spent Fuel Handling
SF
17
07
Hot Cell Cleanup
17
9x
Other (Use Numbers 90-99)
DISPOSAL (OTHER THAN COMMERCIAL)
18
CY
18
01
Landfill/Burial Ground/Trench/Pits
CY
18
02
Above-Ground Vault
CY
18
03
Underground Vault
CY
18
04
Underground Mine/Shaft
MGA
18
05
Tanks