WBS Number
DESCRIPTION
QTY UOM UNIT
COST
COST
$
EA
331XX 03 14
Fuel Storage Tanks (New)
03 9X
Other (Use Numbers 90-99)
04
ORDNANCE AND EXPLOSIVE - CHEMICAL WARFARE
ACR
04 01
Ordnance Removal and Destruction
04 9x
Other (Use Numbers 90-99)
05
SURFACE WATER COLLECTION AND CONTROL
LF
05
01
Berms/Dikes
Floodwalls
SF
05
02
LF
05
03
Levees
LF
05
04
Terraces and Benches
LF
05
05
Channels/Waterways (Soil/Rock)
LF
05
06
Chutes or Flumes
LF
05
07
Sediment Barriers
LF
05
08
ACR
05
09
Lagoons/Basins/Tanks/Dikes/Pump System
MGA
05
10
Pumping/Draining/Collection
MGA
05
11
Transport to Treatment Plant
CY
05
12
Earthwork
ACR
05
13
Erosion Control
ACR
05
14
Development of Borrow Pit/Haul Roads
05
9X
Other (Use Numbers 90-99)
06
EA
06
01
Extraction and Injection Wells
LF
06
02
SF
06
03
Slurry Walls
SF
06
04
Grout Curtain
SF
06
05
Sheet Piling
ACR
06
06
Lagoons/Basins/Tanks/Dikes/Pump System
MGA
06
07
Pumping/Collection
MGA
06
08
Transport to Treatment Plant
ACR
06
09
Development of Borrow Pit/Haul Roads
06
9x
Other (Use Numbers 90-99)
07
LF
07
01
Gas/Vapor Collection Trench System
EA
07
02
Gas/Vapor Collection Well System
SY
07
03
Gas/Vapor Collection at Lagoon Cover
ACR
07
04
Fugitive Dust/Vapor/Gas Emissions Control
07
9x
Other (Use Numbers 90-99)
08
SOLIDS COLLECTION AND CONTAINMENT
CY
08 01
Contaminated Soil Collection
CY
08 02
Waste Containment, Portable (Furnish/Fill)
CY
08 03
Transport to Treatment Plant