EP 1165-2-1
30 Jul 99
ER 415-2-100, Staffing for Civil Works Projects.
ER 500-1-1, Natural Disaster Procedures.
ER 1105-2-100, Guidance for Conducting Civil Works Planning Studies.
ER 1110-2-50, Low Level Discharge Facilities for Drawdown of
Impoundments.
ER 1110-2-240, Water Control Management.
ER 1110-2-241, Use of Storage Allocated for Flood Control and
Navigation at Non-Corps Projects.
ER 1110-2-1150, Engineering and Design for Civil Works Projects.
ER 1110-2-1155, Dam Safety Assurance Program.
ER 1110-2-1156, Dam Safety - Organization, Responsibilities,and
Activities.
ER 1110-2-1302, Civil Works Cost Engineering.
ER 1110-2-1403, Studies by Corps Hydraulic and Hydrologic Facilities
and Others.
ER 1110-2-1451, Acquisition of Lands Downstream from Spillways for
Hydrologic Safety Purposes.
ER 1110-2-1454, Corps Responsibilities for Non-Federal Hydroelectric
Power Development under the Federal Power Act.
ER 1110-2-1457, Hydraulic Design of Small Boat Navigation.
ER 1110-2-1458, Hydraulic Design of Shallow Draft Navigation Projects.
ER 1110-2-1941, Drought Contingency Plans.
ER 1110-2-2902, Prescribed Procedures for the Maintenance and
Operation of Shore Protection Works.
ER 1110-2-8151, Monitoring Coastal Projects.
ER 1110-2-8154, Water Quality and Environmental Management for Corps
Civil Works Projects.
ER 1110-8-2(FR), Inflow Design Floods for Dams and Reservoirs.
ER 1130-2-406, Shoreline Management at Civil Works Projects.
ER 1130-2-500, Project Operations - Partners and Support (Work
Management Policies).
ER 1130-2-510, Project Operations - Hydroelectric Power Operations and
Maintenance Policies.
A-7