Home
Download PDF
Order CD-ROM
Order in Print
Home
>
USACE Engineering Pamphlets CD 2 - index
>
> Figure 8-37. Bottom longitudinal " side-by-side" filling and emptying system, Dardanelle Lock, Arkansas River.
Figure 8-36. Outlet system, Olmsted Locks, Ohio River (Stockstill, 1992)
Figure 8-38. Bottom longitudinal "over-and-under" filling and emptying system, Bankhead Lock, 69-ft lift, Black Warrior River, Alabama (Murphy, 1980)
EP 1110-2-14
Page Navigation
88
89
90
91
92
93
94
95
96
97
98