Home
Download PDF
Order CD-ROM
Order in Print
Home
>
USACE Engineering Pamphlets CD 2 - index
>
> EP 1110-2-13
Chapter 1. Introduction - EP-1110-2-130006
Chapter 2. General Considerations
Administration of Dam Safety in the Corps of Engineers
Major Subordinate Commands (MSC).
Applicable Dams
Regulatory Permit Program for Non-Federal Dams
Dredged or fill material
Chapter 3. Civil Works Project Planning and Design Process
Construction Phase
Chapter 4. Operation and Maintenance
Periodic Inspection and Continuing Evaluation
Reporting Distress
Examples.
Chapter 5. Rehabilitation and Modification of Dams
Policy on seismic criteria.
Procedural Requirements
Design memorandum.
Chapter 6. Emergency Action Plans (EAP)
Notifications internal to the Corps.
Number of Emergency Action Plans Required
Emergency Action Plan Exercises
Tabletop exercise.
Public information.
Chapter 7. Training
Table 7-1. Training Aids for Dam Safety Module
Appendix A. References - EP-1110-2-130031
Related Publications2
Related Publications2 (cont)
Related Publications2 (cont) - EP-1110-2-130034
Related Publications2 (cont) - EP-1110-2-130035
Related Publications2 (cont) - EP-1110-2-130036
Appendix B. Glossary - EP-1110-2-130037
Terms
Terms (cont)
Masonry dam.
Dam safety
Earthquake, Operating Basis (OBE)
Flood routing
Emergency gate.
Height, above ground
Outlet works
Reservoir surface area
Dead storage.
Hollow jet valve.
Weir, broad-crested.
Appendix C. Design
Coordination Between Design and Construction
Excavation of tunnels.
Appendix D. Construction
Obtaining Quality Construction
As-constructed drawings.
Appendix E. Research and Development
Coordination Among Federal Agencies
EP 1110-2-13