EP 1110-1-8
(Vol. 9)
31 July 03
Use this worksheet to compute rates for equipment that is not in this pamphlet.
1. EQUIPMENT INFORMATION AND EXPENSE FACTORS
ID No.:
a.
Equipment Specification Data:
(1) Equipment Description:
Clark front-end wheel loader
(2) Model and Series:
Model 125C, 4WD, 4 CY capacity
(3) Year of Use:
2003
(4) Year Manufactured:
1986
203
(7) Fuel type:
- Equipment: gas/diesel off-road/diesel on-road/electric/air D-off
- Carrier: gas/diesel off-road/diesel on-road/electric/air
(8) Shipping Weight (cwt):
367 cwt
(9) Tire size and number of tires: (Cost of tires based on year of use see 1.a.(3) and
appendix F)
No.
Size/Ply
Unit Price
Cost
$
$
(a) Front (FT):
$ 1,769.00
$ 7,076.00
23.5x25/16 ply
4-ANNBS
(b) Drive (DT):
$
$
(c) Trailing (TT):
$
(d) Total Tire Cost:
7,076.00
USE APPENDIX D TO COMPLETE THE FOLLOWING DATA:
b.
Category and Subcategory Number:
L40 0.11
c.
Hourly Expense Calculation Factors:
(1) Economic Key (EK):
45
(2) Condition (C):
X Average
or
Severe or
Difficult
(3) Discount Code (DC): B = 7.5% (0.075) or S = 15.0% (0.15)
0.075
(4) Life in Hours (LIFE):
9,250
(5) Salvage Value Percentage (SLV):
0.25
(6) Fuel Factor Equipment [Electric (E) Gas (G) Diesel (D)]:
0.033
(7) Fuel Factor Carrier (E G D):
0.000
(8) Filters, Oil, and Grease (FOG) Factor (E G D):
0.445
(9) Tire Wear Factor:
(a)
Front (FT):
0.00
(b)
Drive (DT):
0.42
(c)
Trailing (TT):
0.00
(10) Repair Cost Factor (RCF):
0.70
Figure 3-1. Total Hourly Rate Calculation for Overage Equipment
Page 1 of 6
3-21