EP 1110-1-8
(Vol. 10)
31 July 03
6. HOURLY RATES
a.
Total Hourly Rate: [based on 40 hours per week (wk)]
(Ownership Cost) + (Operating Cost)
($0.00
/hr) + ($0.00
/hr)
=$
0.00 /hr
b.
Other Work Shifts Hourly Rate:
(Refer to Chapter 3, Adjustments to Rates, for methodology.)
[(Depreciation) + [(FCCM) x (40 hr/wk) / (Work hr/wk)] + (Operating Cost)]
[4.a.(2)]
[4.b.(2)]
(example: 60 hr/wk)
[5.g.]
/hr) + [($0.00
/hr) x (40 hr/wk) / (0
hr/wk)] + ($0.00
/hr)]
[($0.00
0.00 /hr
=$
c.
Standby Hourly Rate:
[(Depreciation) x 0.50] + (FCCM)
[4.a.(2)]
[4.b.(2)]
[($12.93
/hr) x 0.50] + ($2.65
/hr)
=$
9.12 /hr)
See Chapter 3 if rate adjustments are necessary.
Figure 3-2. Standby Hourly Rate Calculation for Overage Equipment
page 6 of 6
3-45