EP 1110-1-28
31 Aug 01
2.1.1.2
Interviews
[The Contractor shall conduct interviews of personnel familiar with facility history and with facility use
patterns. Personnel to be interviewed shall include:
a. Installation Lead Hazard Management Team Leader
b. Installation Environmental Officer - to determine if LBP has been found in previous
assessments, to review preexisting survey data, if provided, to identify LBP locations, to verify
maintenance histories, and to coordinate unit access procedures.
c. Director of Public Works - to discuss assessment logistics, i.e., access and assessment
scheduling.
d. [The Safety Officer]
e. [Installation Medical Authority to review the Childhood Lead Poisoning Prevention
Program (CLPP Program).]
f. [The Chief of Housing to coordinate assessment logistics including occupant access
and notification procedures.]
g. [insert others whose interviews are important to the project]]
2.1.1.3
Summary of Preexisting Data, Lead Hazard Management Plan, and Interviews
[The Contractor shall complete a project deliverable as an attachment to the Project Work Plan that
summarizes the review of preexisting data, [the Lead Hazard Management Plan], and interviews for the
units to be assessed, based on the information provided above. The summary shall address the
following:
A brief summary of the reliability of data from previous studies.
b. Lead Hazard Management Plan
A brief summary of the Installation's Lead Hazard Management Plan information pertinent to the risk
assessment including any previous lead-based paint identification data, and maintenance history and
practices.
c. Interviews
A brief summary of the interviews and the conclusions reached.]
2.1.2
******************************************************************************
NOTE: If digital site maps and floor plans for each type of unit are not
available, the SOW editor may wish to have the contractor prepare Computer
Assisted Design and Drafting (CADD) drawings of the units involved with the
A-16