EP 1110-1-27
27 Jan 00
Table 10-1. Approximate Costs of PM Equipment
Equipment
Method
Cost
(1) Chemical mixing. A tank trailer equipped as recommended
Purchase
,500.00
(2) Equipment handling.
(a) Standard 5-ton(4535-k)-hoisting capacity pump hoist
Purchase
,000.00
equipped as described.
Hired (per
||content||
,500.00
day)
(b) Motorized, reversible pump puller unit
Purchase
,000.00
(c) Equipment to handle flexible well pipe
Purchase
||content||
,000.00
(3) Development and test pumping trailer (equipped).
Purchase
,000.00
(4) Ancillary gear.
Purchase
,200.00
Rent per
0.00 to
||content||
,000
week
(c) Maintenance monitoring instruments and apparatus
Purchase
,000.00
(d) Recommended spare parts and equipment
Purchase
,000.00
10-3