EP 1110-1-23
31 Jan 99
at the abatement site, the Monitoring Contractor will follow and comply with the Abatement
Contractor's accepted Asbestos Hazard Abatement Plan and Accident Prevention Plan for site
activity.
3.1 Task l, Document Review. The Monitoring Contractor will obtain and review
pertinent abatement contract documents to include, but not be limited to, the asbestos abatement
specifications, the Abatement Contractor's Asbestos Hazard Abatement Plan, Accident Prevention
Plan, and detailed project drawings to become familiar with the abatement procedures to be
conducted.
3.2 Task 2, Air Monitoring Plan Preparation. The Monitoring Contractor will prepare
and submit to the CO for review and approval an Air Monitoring Plan which describes the
proposed air monitoring strategies. The plan will include a description of proposed sampling
methods and equipment with schematic diagrams approximating sample locations and a
description of record keeping methods. A separate section will list the qualifications and
organizational structure and include documentation of qualifications for the Monitoring
Contractor's personnel to include the Designated IH and the Monitoring Contractor's independent
testing laboratory and analysts. Documentation will include any state licenses and certifications of
required training. The plan will be signed by the Monitoring Contractor and the Designated IH.
3.2.1 Industrial Hygienist Qualifications. The qualifications and organization section in
the Air Monitoring Plan will provide the name, address, telephone number, and resume of the
Designated IH selected to direct air monitoring. The IH will be a person who is [board-certified
in the comprehensive or specialized practice of industrial hygiene] [board-eligible (meets all
education and experience requirements)] as determined and documented by the American Board
of Industrial Hygiene (ABIH), and has a minimum of [2] [__] years of experience in air
monitoring for asbestos abatement activities and is licensed by the state as required. The IH will
be completely independent from the Abatement Contractor and will not be an employee or
A-3