WBS Number
DESCRIPTION
QTY
UOM
UNIT
COST
COST
$
342XX 05 08
LF/YR
05 09
Lagoons/Basins/Tanks/Dikes/Pump System
ACR/YR
05 10
Pumping/Draining/Collection
MGA
05 11
Transport to Treatment Plant
MGA
05 13
Erosion Control
ACR/YR
05 9X
Other (Use Numbers 90-99)
06
06 01
Extraction and Injection Wells
EA/YR
06 02
LF/YR
06 03
Slurry Walls
SF/YR
06 04
Grout Curtain
SF/YR
06 05
Sheet Piling
SF/YR
06 06
Lagoons/Basins/Tanks/Dikes/Pump System
ACR/YR
06 07
Pumping/Collection
MGA
06 08
Transport to Treatment Plant
MGA
06 9x
Other (Use Numbers 90-99)
07
07 01
Gas/Vapor Collection Trench System
LF/YR
07 02
Gas/Vapor Collection Well System
EA/YR
07 03
Gas/Vapor Collection at Lagoon Cover
SY/YR
07 04
Fugitive Dust/Vapor/Gas Emissions Control
ACR/YR
07 9x
Other (Use Numbers 90-99)
08
SOLIDS COLLECTION AND CONTAINMENT
08 01
Contaminated Soil Collection
CY
08 02
Waste Containment, Portable (Furnish/Fill)
CY
08 03
Transport to Treatment Plant
CY
08 04
Radioactive Specific Waste Containment (Furnish/Fill)
CY
08 05
Capping of Contaminated Area/Waste Pile (Soil/Asph
ACR/YR
08 06
Nuclear Waste Densification (Dynamic Compaction)
CY
08 9x
Other (Use Numbers 90-99)
09
LIQUIDS/SEDIMENTS/SLUDGES COLLECTION AND
CONTAINMENT
09 01
Dredging/Excavating
CY
09 02
Industrial Vacuuming
CY
09 03
Waste Containment, Portable (Furnish/Fill)
MGA
09 04
Transport to Treatment Plant
MGA
09 05
Radioactive Specific Waste Containment (Furnish/Fill)
MGA
09 06
Pumping/Draining/Collection
MGA
09 07
Lagoons/Basins/Tanks/Dikes/Pump System
ACR/YR