WBS Number
DESCRIPTION
QTY
UOM
UNIT
COST
COST
$
34XXX
HTRW POST CONSTRUCTION AND FINANCIAL
CLOSEOUT ACTIVITIES
341XX
FISCAL/FINANCIAL CLOSE ACTIVITIES
342XX
HTRW OPERATION AND MAINTENANCE (POST
CONSTRUCTION)
02
MONITORING, SAMPLING, TESTING, AND
02 01
Meteorological Monitoring
EA
02 02
EA
02 03
Air Monitoring and Sampling
EA
02 04
Monitoring Wells
EA
02 05
EA
02 06
Sampling Soil and Sediment
EA
02 07
Sampling Asbestos
EA
02 08
Sampling Radioactive Contaminated Media
EA
02 09
Laboratory Chemical Analysis
EA
02 10
Radioactive Waste Analysis
EA
02 11
Geotechnical Testing
EA
02 12
EA
02 13
On-site Laboratory Facilities
EA
02 14
Off-site Laboratory Facilities
EA
02 9X
Other (Use Numbers 90-99)
EA
03
SITEWORK
03 04
Roads/Parking/Curbs/Walks
SY/YR
03 05
Fencing
LF/YR
03 06
Electrical Distribution
LF/YR
03 07
Telephone/Communication Distribution
LF/YR
03 08
Water/Sewer/Gas Distribution
LF/YR
03 09
Steam and Condensate Distribution
LF/YR
03 10
Fuel Line Distribution
LF/YR
03 11
LF/YR
03 12
Permanent Cover Structure Over Contaminated Area
SF/YR
03 14
Fuel Storage Tanks (New)
EA/YR
03 9X
Other (Use Numbers 90-99)
05
SURFACE WATER COLLECTION AND CONTROL
05 01
Berms/Dikes
LF/YR
05 02
SF/YR
Floodwalls
05 03
Levees
LF/YR
05 04
Terraces and Benches
LF/YR
05 05
Channels/Waterways (Soil/Rock)
LF/YR
05 06
Chutes or Flumes
LF/YR
05 07
Sediment Barriers
LF/YR