SECTION ELEVEN
References
1. USEPA Region 3, Record of Decision Slippery Chemical Superfund Site, Operable Unit 3,
August 1988.
2. USEPA's Slippery Chemical Home Page,
3. Fact Sheet, "Slippery Chemical Superfund Site On-Site Soil Incineration", October 1, 1999.
4. Slippery Project Summary Milestones
5. USACE, Specifications (for Fixed-Price Services Contract), On-Site Soil Incineration,
Slippery Chemical Superfund Site, April 1993.
6. James Q. Public, Consulting Engineers, Inc., Incineration Treatability Study Report, Slippery
Chemical Superfund Site, August 1991.
7. Texarkana Research Institute, Trial Burn Plan for the Slippery Chemical Superfund Site,
September 20, 1996.
8. H&S Consultants, Wastewater Management Plan, Revision No. 3, for On-Site Soil
Incineration, Slippery Chemical Superfund Site, August 1997.
9. Sandra Upps of TNRCC, Air Equivalency Permit, February 6, 1998.
10. Eastern, Slippery Chemical Site, Incinerator Full-Scale Operation, Integrated Risk
Assessment, November 1997.
11. H&S Consultants, Quantity Tracking Logs and Volume Calculation Information, October 28,
1999.
12. H&S Consultants, Test Report for Trial Burns No. 1 and No. 2 on the Slippery Chemical
Superfund Site's Mobile On-Site Hazardous Waste Incinerator, September 12, 1997.
13. Perry's Chemical Engineers' Handbook, Sixth Edition, McGraw Hill Book Company, New
York, 1984.
15. Analytical results from full-scale incineration operations (not bound in a report).
16. Chad R. Rogers and Michael B. Provo, USACE, Slippery Chemical Superfund Onsite
Incineration Project Lessons Learned.
17. USACE, Internal Project Description, Slippery Chemical Superfund Site.
18. MTV Laboratories, Hydrometer Analysis Reports, Slippery Chemical Superfund Site,
November 15, 1996 through April 1, 1999.
19. Stan Bopp, USACE, Final Cost Report, Slippery Chemical Superfund Site, April 21, 2000.
11- 1
Slippery Chemical OU 3 Final RA Report