"Evaluation of Arkansas River Design Criteria for Stabilization and Rectification of the
Channel," M.S. Petersen, E.M. Laursen, Report to the U.S. Army Corps of
Engineers, December 1986.
"Interim Report on Hinged Pool Operation: Red River Waterway," E.M. Laursen, M. S.
Petersen, S. Chanyotha, and S.M. Cooke, Report to
Army Corps of Engineers,
April 1988.
"Interim Report on Stabilization and Rectification Work, Pools 5 and 4, Red River
Waterway," M.S. Petersen, E.M. Laursen, S.M. Cooke, and S. Chanyotha,Report
to U.S. Army Corps of Engineers, May,
Report on Evaluation of the Program for Stabilization and Rectification of the Red
River below Shreveport, Louisiana," M. S. Petersen, E. Laursen, S.M. Cooke, S.
Chanyotha, Report to U.S. Army Corps of Engineers, October, 1988.
"Open-River Operation and Sediment Transport, Arkansas River Navigation Project,"
Proceedings of
Symposium on
for High Dams, Beijing,
November, 1988.
"It's Been a Richly Rewarding Life," in Sons of Martha:
Engineering Readings in
Modern
edited by A.J. Fredrich, New York: American Society of Civil
1989.
Registration:
Registered Professional Engineer in the State of Iowa (194%present)