a. Box 1 - Notice No. - Print or type in bold letters "MOU" on all SF 98s submitted to DOL
under the WDOL Program.
b. Box 2 - Estimated Solicitation Date - The date on which the invitation for bid or request for
proposals will be issued.
c. Box 3 - Estimated Date Bids or Proposals Are to be Opened or Negotiations Begun -
Self-explanatory. (If other than solicitation, note in this box "Option" or "Extension").
d. Box 4 - Date Contract Performance to Begin - Self-explanatory.
e. Box 5 - Place(s) of Performance -
(1) Box 5a. County and State (2-letter abbreviation) where services are to be performed. This is a
required entry.
(2) Box 5b. Installation or city name may be written below county and state.
(3) Box 5c. If place of performance is unknown, list all possible or potential places based on
bidders list (reference FAR 22.1009).
(4) Box 5d. For multiple locations, note "Attachment A" in Box 5, and list all locations on a
separate, attached sheet (include at the heading of that sheet and all other attachments the SF 98
number and the "MOU" notation).
f. Box 6 - Services to be Performed - Use specific, general terminology. Do not use acronyms.
Terms such as "construction", "fabrication", or "demolition" prompt further questions regarding possible
application of other labor laws. Add sufficient information to anticipate and answer those questions (i.e.,
"demolition - NOT followed by construction activity"). If the contract results from a reconfiguration or
consolidation of several other contracts, Box 6 (or an attachment sheet) should contain a list of those
previous contract services and applicable WDs.
g. Box 7 - Information About Contract Performance -
5-7