Table 3. Summary of Sponsor Funding Requirements and Other Contributions for Ecosystem Restoration Projects *
Congressionally Authorized Projects1
Item
Section 1135
Section 206
Section 204 and 207
Non-Federal Cost Share
50% - Feasibility study
25% - Total project costs
35% -Total project costs
25% - Total cost of
35% - Implementation costs2
increment over baseline
project
Sponsor Work in-kind 3
50% of non-Federal share of feasibility study
No more than 80% of the non-Federal share of
The entire sponsor share
None.
costs (i.e. 25% of feasibility study costs); no
total project costs; can include plans and
maybe work-in-kind,
work-in-kind for post-feasibility phase design,
specifications, materials, and project construction.
including plans and
plans and specifications, materials, or project
specifications, materials, and
construction.
project construction.
Sponsor provided
100%
100% of those not available from existing project.
100%
100% of those not available
LERRDs4
from existing project.
100%5
OMRR&R
100%
100%
100%
Federal Funding Limit per
As stated in authorization and subject to Sec.
M
M
None
Project
902 WRDA 86 cap.
Contributions from Other
Funds from another Federal agency shall not be used by the non-Federal sponsor to meet its share for the project costs unless the Federal granting agency verifies in
writing that the expenditure of such funds is expressly authorized by statute6 .
Federal Agencies
Voluntary
Applied toward total project costs to reduce both Federal and sponsor shares.
contributions7
*Specific requirements for each project will be detailed in the PCA decision documents.
LERRDS: lands, easements, rights-of-way, relocations and disposal; OMRR&R: operations, maintenance, repair, rehabilitation, and replacement.
1
For ecosystem restoration projects or separable elements, or an environmental part of a multiple purpose project.
2
Implementation Costs: LERRDs, post-feasibility phase design, including plans and specifications, materials, and project construction.
3
Work-in-kind may not result in reimbursement of sponsor when combined with LERRDs for Section 1135 and Section 206. The PCA must be executed before initiation of the
work-in- kind for Section 1135 and Section 206. The dollar value of the work-in-kind will be established prior to the initiation of the in-kind effort.
4
If LERRDs are greater than the required non-Federal share, the sponsor may be reimbursed for the increment over its required share.
5
Where the project is on Corps project lands, there may be instances in which it may be appropriate for the Corps to perform the OMRR&R as part of the current OMRR&R.
6
Per consultation with the Department of Interior, funds from the following may not be used by states as the non-Federal share: Federal Aid in Wildlife Restoration Act
(Pittman-Robertson), Federal Aid in Sport Fisheries Restoration Act (Dingel-Johnson), and North American Wetlands Conservation Act (Mitchell Bill) funds.
7
Per Section 203 of WRDA 92, voluntary contributions of cash, funds, materials, and services may be accepted from sources, including governmental entities, but excluding
the project sponsor. Any cash or funds received per this provision are to be deposited into the account in the U.S. Treasury entitled "Contributions and Advances, Rivers and Harbors, Corps
of Engineers (8662) and shall be available until expended to carry out the ecosystem restoration project.