EP 1130-2-510
13 Dec 96
APPENDIX L
EVALUATION ITEMS
L-1. Units in plant:
L-4. History:
(a) Total number
(a) Non-routine
maintenance performed
(b) Number of units with
similar windings
(b) Failures and
resolution
L-2. Operating conditions:
L-5. Experience with similar windings
(a) Overload
installation
(b) Temperature
(c) Peaking, base loaded,
C)
condensing, or other
(d) Starts per month
L-8. Letter of Support and/or Marketability
for PMA
(other cycling modes)
(e) Age
L-9. Potential Environmental Issues
(f) Hours of operation
L-3. Winding conditions:
(a) Visual inspection
results
(b) Stator electrical tests (significant
tests supporting the recommended course of
action)
L-1