EP 1130-2-510
13 Dec 96
XI. INSPECTIONS
A. Motor Control Centers
1. Breakers
2. Contractors
3. Space Heaters
4. Wiring
5. Terminal Blocks
B. Motors
1. Windings
2. Commutators and Slip
Rings
3. Wiring
4. Insulation
2. Speed Switches
3. Windings
4. Surge Protection
5. ACB
D. Recording Data
E. Clearance Procedure
G-15