EP 1110-1-8
(Vol. 9)
31 July 03
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE
VALUE
ADJUSTABLE
TOTAL HOURLY
REGION 9
FUEL TYPE
(TEV)
ELEMENTS
RATES ($/HR)
AVERAGE STANDBY DEPR
CAT
ID.NO.
MODEL
EQUIPMENT DESCRIPTION
2000 ($)
FCCM
FUEL
CWT
MAIN
CARRIER
B30
GAR-BRO MANUFACTURING COMPANY
(continued)
B30GB005 4123-G
BUCKET, CONCRETE, GENERAL PURPOSE, 4.0
,588
2.17
0.67
1.02
0.16
0.00
18
CY
SUBCATEGORY 0.20
LAYDOWN
GAR-BRO MANUFACTURING COMPANY
B30GB006 425-A
BUCKET, CONCRETE, LAYDOWN, 1.0 CY, HEAVY
,800
4.13
1.24
1.88
0.30
0.00
26
DUTY AIR GATE
B30GB007 465-A
BUCKET, CONCRETE, LAYDOWN, 2.0 CY, HVDY
,070
4.47
1.35
2.03
0.33
0.00
32
AIR GATE
B30GB008 495-A
BUCKET, CONCRETE, LAYDOWN, 3.0 CY, HEAVY
,060
4.98
1.50
2.26
0.37
0.00
40
DUTY AIR GATE
B30GB009 4125-A
BUCKET, CONCRETE, LAYDOWN, 4.0 CY, HEAVY
,784
5.70
1.72
2.59
0.42
0.00
51
DUTY AIR GATE
B30GB010 4155-A
BUCKET, CONCRETE, LAYDOWN, 5.0 CY, HEAVY
,025
7.06
2.13
3.21
0.52
0.00
73
DUTY AIR GATE
SUBCATEGORY 0.30
LOWBOY
CAMLEVER
B30CR001 LB-375
BUCKET, CONCRETE, LOWBOY, 0.38 CY, AIR
,027
1.09
0.32
0.48
0.08
0.00
2
GATE
B30CR002 LB-050
BUCKET, CONCRETE, LOWBOY, 0.5 CY, AIR
,317
1.16
0.34
0.51
0.08
0.00
2
GATE
B30CR003 LB-075
BUCKET, CONCRETE, LOWBOY, 0.75 CY, AIR
,665
1.25
0.37
0.55
0.09
0.00
3
GATE
B30CR004 LB-100
BUCKET, CONCRETE, LOWBOY, 1.0 CY, AIR
,835
1.30
0.38
0.57
0.09
0.00
5
GATE
B30CR005 LB-150
BUCKET, CONCRETE, LOWBOY, 1.5 CY, AIR
,694
1.54
0.45
0.68
0.11
0.00
6
GATE
B30CR009 LXB-150
BUCKET, CONCRETE, LOWBOY, 1.5 CY, AIR
,990
1.61
0.47
0.71
0.11
0.00
6
GATE
B30CR006 LB-200
BUCKET, CONCRETE, LOWBOY, 2.0 CY, AIR
,703
1.81
0.53
0.80
0.13
0.00
8
GATE
B30CR010 LXB-200
BUCKET, CONCRETE, LOWBOY, 2.0 CY, AIR
,980
1.88
0.55
0.83
0.13
0.00
6
GATE
2-43