EP 1110-1-8
(Vol. 8)
31 July 03
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE
VALUE
ADJUSTABLE
TOTAL HOURLY
REGION 8
FUEL TYPE
(TEV)
ELEMENTS
RATES ($/HR)
AVERAGE STANDBY DEPR
CAT
ID.NO.
MODEL
EQUIPMENT DESCRIPTION
2000 ($)
FCCM
FUEL
CWT
MAIN
CARRIER
B30
GAR-BRO MANUFACTURING COMPANY
(continued)
B30GB005 4123-G
BUCKET, CONCRETE, GENERAL PURPOSE, 4.0
,056
1.90
0.59
0.96
0.11
0.00
18
CY
SUBCATEGORY 0.20
LAYDOWN
GAR-BRO MANUFACTURING COMPANY
B30GB006 425-A
BUCKET, CONCRETE, LAYDOWN, 1.0 CY, HEAVY
,902
3.61
1.09
1.77
0.20
0.00
26
DUTY AIR GATE
B30GB007 465-A
BUCKET, CONCRETE, LAYDOWN, 2.0 CY, HVDY
,055
3.90
1.18
1.91
0.22
0.00
32
AIR GATE
B30GB008 495-A
BUCKET, CONCRETE, LAYDOWN, 3.0 CY, HEAVY
,879
4.33
1.30
2.12
0.24
0.00
40
DUTY AIR GATE
B30GB009 4125-A
BUCKET, CONCRETE, LAYDOWN, 4.0 CY, HEAVY
,373
4.95
1.49
2.42
0.28
0.00
51
DUTY AIR GATE
B30GB010 4155-A
BUCKET, CONCRETE, LAYDOWN, 5.0 CY, HEAVY
,164
6.10
1.84
2.99
0.34
0.00
73
DUTY AIR GATE
SUBCATEGORY 0.30
LOWBOY
CAMLEVER
B30CR001 LB-375
BUCKET, CONCRETE, LOWBOY, 0.38 CY, AIR
,850
0.96
0.28
0.46
0.05
0.00
2
GATE
B30CR002 LB-050
BUCKET, CONCRETE, LOWBOY, 0.5 CY, AIR
,130
1.04
0.31
0.49
0.06
0.00
2
GATE
B30CR003 LB-075
BUCKET, CONCRETE, LOWBOY, 0.75 CY, AIR
,453
1.11
0.33
0.53
0.06
0.00
3
GATE
B30CR004 LB-100
BUCKET, CONCRETE, LOWBOY, 1.0 CY, AIR
,594
1.15
0.34
0.55
0.06
0.00
5
GATE
B30CR005 LB-150
BUCKET, CONCRETE, LOWBOY, 1.5 CY, AIR
,409
1.35
0.39
0.64
0.07
0.00
6
GATE
B30CR009 LXB-150
BUCKET, CONCRETE, LOWBOY, 1.5 CY, AIR
,693
1.43
0.42
0.68
0.08
0.00
6
GATE
B30CR006 LB-200
BUCKET, CONCRETE, LOWBOY, 2.0 CY, AIR
,356
1.59
0.47
0.75
0.09
0.00
8
GATE
B30CR010 LXB-200
BUCKET, CONCRETE, LOWBOY, 2.0 CY, AIR
,646
1.66
0.49
0.79
0.09
0.00
6
GATE
2-43