EP 1110-1-8
(Vol. 6)
31 July 03
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE
VALUE
ADJUSTABLE
TOTAL HOURLY
REGION 6
FUEL TYPE
(TEV)
ELEMENTS
RATES ($/HR)
AVERAGE STANDBY DEPR
CAT
ID.NO.
MODEL
EQUIPMENT DESCRIPTION
2000 ($)
FCCM
FUEL
CWT
MAIN
CARRIER
C25
WACKER CORPORATION (continued)
C25WC003 CT46A
CONCRETE FINISHER, POWER TROWEL, 2 SETS
20 HP
G
,720
6.57
1.12
1.88
0.18
2.16
8
OF 4 - 48" DIA BLADES
SUBCATEGORY 0.20
VIBRATORY SCREED
ALLEN ENGINEERING CORP.
C25AJ003
12HED
CONCRETE, VIBRATORY SCREED, 12.5'
9 HP
G
,594
3.07
0.54
0.90
0.09
0.97
5
WIDE
C25AJ001
12 HD
CONCRETE, VIBRATORY SCREED, 20'
8 HP
G
,955
2.39
0.38
0.63
0.06
0.86
4
WIDE
C25AJ004
12HED
CONCRETE, VIBRATORY SCREED, 30'
9 HP
G
,991
3.83
0.76
1.28
0.12
0.97
8
WIDE
C25AJ005
12HED
CONCRETE, VIBRATORY SCREED, 40'
11 HP
G
,380
4.57
0.90
1.50
0.15
1.19
10
WIDE
C25AJ006
12HED
CONCRETE, VIBRATORY SCREED, 50'
11 HP
G
,140
5.13
1.06
1.78
0.17
1.19
12
WIDE
C25AJ007
12HED
CONCRETE, VIBRATORY SCREED, 55'
11 HP
G
,847
5.36
1.13
1.90
0.18
1.19
13
WIDE
SUBCATEGORY 0.25
VIBRATORY LASER SCREED
SOMERO ENTERPRISES, INC.
C25SV003 S-100
CONCRETE, VIBRATORY LASER SCREED, 8'
30 HP
D-off
8,266
25.52
8.14
12.01
2.13
1.32
72
WIDE X 12' BOOM
C25SV002 S-160
CONCRETE, VIBRATORY LASER SCREED, 8'
65 HP
D-off
8,816
43.12
13.49
19.94
3.52
2.85
126
WIDE X 20' BOOM
C25SV001 S-240
CONCRETE, VIBRATORY LASER SCREED, 12'
65 HP
D-off
4,734
52.71
16.78
24.80
4.38
2.85
151
WIDE X 20' BOOM
SUBCATEGORY 0.30
MATERIAL/TOPPING SPREADERS
ALLEN ENGINEERING CORP.
C25AJ008
SP23H
CONCRETE, MATERIAL/TOPPING SPREADER,
6 HP
G
,495
3.08
0.80
1.18
0.21
0.55
11
12.5' WIDE
C25AJ009
SP23H
CONCRETE, MATERIAL/TOPPING SPREADER,
6 HP
G
,327
3.22
0.85
1.25
0.22
0.55
12
20' WIDE
2-53