Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE
VALUE
ADJUSTABLE
TOTAL HOURLY
REGION 4
FUEL TYPE
(TEV)
ELEMENTS
RATES ($/HR)
AVERAGE STANDBY DEPR
CAT
ID.NO.
MODEL
EQUIPMENT DESCRIPTION
2000 ($)
FCCM
FUEL
CWT
MAIN
CARRIER
C25
WACKER CORPORATION (continued)
C25WC003 CT46A
CONCRETE FINISHER, POWER TROWEL, 2 SETS
20 HP
G
,390
7.13
1.13
1.82
0.22
2.31
8
OF 4 - 48" DIA BLADES
SUBCATEGORY 0.20
VIBRATORY SCREED
ALLEN ENGINEERING CORP.
C25AJ003
12HED
CONCRETE, VIBRATORY SCREED, 12.5'
9 HP
G
,438
3.32
0.54
0.87
0.10
1.04
5
WIDE
C25AJ001
12 HD
CONCRETE, VIBRATORY SCREED, 20'
8 HP
G
,845
2.59
0.38
0.62
0.07
0.92
4
WIDE
C25AJ004
12HED
CONCRETE, VIBRATORY SCREED, 30'
9 HP
G
,768
4.14
0.77
1.24
0.15
1.04
8
WIDE
C25AJ005
12HED
CONCRETE, VIBRATORY SCREED, 40'
11 HP
G
,119
4.93
0.90
1.46
0.17
1.27
10
WIDE
C25AJ006
12HED
CONCRETE, VIBRATORY SCREED, 50'
11 HP
G
,829
5.52
1.07
1.73
0.20
1.27
12
WIDE
C25AJ007
12HED
CONCRETE, VIBRATORY SCREED, 55'
11 HP
G
,517
5.77
1.14
1.84
0.22
1.27
13
WIDE
SUBCATEGORY 0.25
VIBRATORY LASER SCREED
SOMERO ENTERPRISES, INC.
C25SV003 S-100
CONCRETE, VIBRATORY LASER SCREED, 8'
30 HP
D-off
4,365
27.21
8.40
11.67
2.56
1.39
72
WIDE X 12' BOOM
C25SV002 S-160
CONCRETE, VIBRATORY LASER SCREED, 8'
65 HP
D-off
2,365
45.99
13.92
19.37
4.23
3.00
126
WIDE X 20' BOOM
C25SV001 S-240
CONCRETE, VIBRATORY LASER SCREED, 12'
65 HP
D-off
6,703
56.19
17.31
24.10
5.26
3.00
151
WIDE X 20' BOOM
SUBCATEGORY 0.30
MATERIAL/TOPPING SPREADERS
ALLEN ENGINEERING CORP.
C25AJ008
SP23H
CONCRETE, MATERIAL/TOPPING SPREADER,
6 HP
G
,116
3.33
0.83
1.15
0.25
0.59
11
12.5' WIDE
C25AJ009
SP23H
CONCRETE, MATERIAL/TOPPING SPREADER,
6 HP
G
,925
3.48
0.87
1.22
0.26
0.59
12
20' WIDE
2-53