Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE
VALUE
ADJUSTABLE
TOTAL HOURLY
REGION 12
FUEL TYPE
(TEV)
ELEMENTS
RATES ($/HR)
AVERAGE STANDBY DEPR
CAT
ID.NO.
MODEL
EQUIPMENT DESCRIPTION
2000 ($)
FCCM
FUEL
CWT
MAIN
CARRIER
B30
GAR-BRO MANUFACTURING COMPANY
(continued)
B30GB005 4123-G
BUCKET, CONCRETE, GENERAL PURPOSE, 4.0
,147
2.00
0.61
0.97
0.12
0.00
18
CY
SUBCATEGORY 0.20
LAYDOWN
GAR-BRO MANUFACTURING COMPANY
B30GB006 425-A
BUCKET, CONCRETE, LAYDOWN, 1.0 CY, HEAVY
,977
3.79
1.11
1.78
0.22
0.00
26
DUTY AIR GATE
B30GB007 465-A
BUCKET, CONCRETE, LAYDOWN, 2.0 CY, HVDY
,187
4.09
1.20
1.92
0.24
0.00
32
AIR GATE
B30GB008 495-A
BUCKET, CONCRETE, LAYDOWN, 3.0 CY, HEAVY
,081
4.58
1.35
2.15
0.27
0.00
40
DUTY AIR GATE
B30GB009 4125-A
BUCKET, CONCRETE, LAYDOWN, 4.0 CY, HEAVY
,672
5.23
1.54
2.45
0.31
0.00
51
DUTY AIR GATE
B30GB010 4155-A
BUCKET, CONCRETE, LAYDOWN, 5.0 CY, HEAVY
,660
6.49
1.91
3.05
0.38
0.00
73
DUTY AIR GATE
SUBCATEGORY 0.30
LOWBOY
CAMLEVER
B30CR001 LB-375
BUCKET, CONCRETE, LOWBOY, 0.38 CY, AIR
,810
1.00
0.29
0.45
0.06
0.00
2
GATE
B30CR002 LB-050
BUCKET, CONCRETE, LOWBOY, 0.5 CY, AIR
,085
1.07
0.31
0.49
0.06
0.00
2
GATE
B30CR003 LB-075
BUCKET, CONCRETE, LOWBOY, 0.75 CY, AIR
,415
1.15
0.33
0.52
0.07
0.00
3
GATE
B30CR004 LB-100
BUCKET, CONCRETE, LOWBOY, 1.0 CY, AIR
,579
1.19
0.34
0.54
0.07
0.00
5
GATE
B30CR005 LB-150
BUCKET, CONCRETE, LOWBOY, 1.5 CY, AIR
,393
1.41
0.40
0.64
0.08
0.00
6
GATE
B30CR009 LXB-150
BUCKET, CONCRETE, LOWBOY, 1.5 CY, AIR
,672
1.47
0.42
0.67
0.08
0.00
6
GATE
B30CR006 LB-200
BUCKET, CONCRETE, LOWBOY, 2.0 CY, AIR
,349
1.65
0.47
0.75
0.09
0.00
8
GATE
B30CR010 LXB-200
BUCKET, CONCRETE, LOWBOY, 2.0 CY, AIR
,608
1.72
0.49
0.78
0.10
0.00
6
GATE
2-43