EP 1110-1-8
(Vol. 11)
31 July 03
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE
VALUE
ADJUSTABLE
TOTAL HOURLY
REGION 11
FUEL TYPE
(TEV)
ELEMENTS
RATES ($/HR)
AVERAGE STANDBY DEPR
CAT
ID.NO.
MODEL
EQUIPMENT DESCRIPTION
2000 ($)
FCCM
FUEL
CWT
MAIN
CARRIER
B30
GAR-BRO MANUFACTURING COMPANY
(continued)
B30GB005 4123-G
BUCKET, CONCRETE, GENERAL PURPOSE, 4.0
,229
1.67
0.60
0.98
0.11
0.00
18
CY
SUBCATEGORY 0.20
LAYDOWN
GAR-BRO MANUFACTURING COMPANY
B30GB006 425-A
BUCKET, CONCRETE, LAYDOWN, 1.0 CY, HEAVY
,176
3.14
1.10
1.80
0.20
0.00
26
DUTY AIR GATE
B30GB007 465-A
BUCKET, CONCRETE, LAYDOWN, 2.0 CY, HVDY
,375
3.39
1.19
1.94
0.22
0.00
32
AIR GATE
B30GB008 495-A
BUCKET, CONCRETE, LAYDOWN, 3.0 CY, HEAVY
,263
3.79
1.34
2.17
0.25
0.00
40
DUTY AIR GATE
B30GB009 4125-A
BUCKET, CONCRETE, LAYDOWN, 4.0 CY, HEAVY
,845
4.32
1.52
2.48
0.28
0.00
51
DUTY AIR GATE
B30GB010 4155-A
BUCKET, CONCRETE, LAYDOWN, 5.0 CY, HEAVY
,809
5.34
1.88
3.06
0.35
0.00
73
DUTY AIR GATE
SUBCATEGORY 0.30
LOWBOY
CAMLEVER
B30CR001 LB-375
BUCKET, CONCRETE, LOWBOY, 0.38 CY, AIR
,892
0.82
0.28
0.46
0.05
0.00
2
GATE
B30CR002 LB-050
BUCKET, CONCRETE, LOWBOY, 0.5 CY, AIR
,173
0.89
0.31
0.50
0.06
0.00
2
GATE
B30CR003 LB-075
BUCKET, CONCRETE, LOWBOY, 0.75 CY, AIR
,506
0.96
0.33
0.54
0.06
0.00
3
GATE
B30CR004 LB-100
BUCKET, CONCRETE, LOWBOY, 1.0 CY, AIR
,660
0.98
0.34
0.55
0.06
0.00
5
GATE
B30CR005 LB-150
BUCKET, CONCRETE, LOWBOY, 1.5 CY, AIR
,487
1.16
0.40
0.65
0.07
0.00
6
GATE
B30CR009 LXB-150
BUCKET, CONCRETE, LOWBOY, 1.5 CY, AIR
,773
1.23
0.43
0.69
0.08
0.00
6
GATE
B30CR006 LB-200
BUCKET, CONCRETE, LOWBOY, 2.0 CY, AIR
,454
1.38
0.48
0.77
0.09
0.00
8
GATE
B30CR010 LXB-200
BUCKET, CONCRETE, LOWBOY, 2.0 CY, AIR
,733
1.43
0.49
0.80
0.09
0.00
6
GATE
2-43