Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE
VALUE
ADJUSTABLE
TOTAL HOURLY
REGION 10
FUEL TYPE
(TEV)
ELEMENTS
RATES ($/HR)
AVERAGE STANDBY DEPR
CAT
ID.NO.
MODEL
EQUIPMENT DESCRIPTION
2000 ($)
FCCM
FUEL
CWT
MAIN
CARRIER
C25
WACKER CORPORATION (continued)
C25WC003 CT46A
CONCRETE FINISHER, POWER TROWEL, 2 SETS
20 HP
G
,346
8.30
1.10
1.82
0.19
2.80
8
OF 4 - 48" DIA BLADES
SUBCATEGORY 0.20
VIBRATORY SCREED
ALLEN ENGINEERING CORP.
C25AJ003
12HED
CONCRETE, VIBRATORY SCREED, 12.5'
9 HP
G
,436
3.86
0.53
0.87
0.09
1.26
5
WIDE
C25AJ001
12 HD
CONCRETE, VIBRATORY SCREED, 20'
8 HP
G
,851
3.06
0.37
0.62
0.06
1.12
4
WIDE
C25AJ004
12HED
CONCRETE, VIBRATORY SCREED, 30'
9 HP
G
,779
4.75
0.75
1.24
0.13
1.26
8
WIDE
C25AJ005
12HED
CONCRETE, VIBRATORY SCREED, 40'
11 HP
G
,141
5.66
0.88
1.46
0.15
1.54
10
WIDE
C25AJ006
12HED
CONCRETE, VIBRATORY SCREED, 50'
11 HP
G
,858
6.32
1.05
1.74
0.18
1.54
12
WIDE
C25AJ007
12HED
CONCRETE, VIBRATORY SCREED, 55'
11 HP
G
,552
6.58
1.12
1.85
0.19
1.54
13
WIDE
SUBCATEGORY 0.25
VIBRATORY LASER SCREED
SOMERO ENTERPRISES, INC.
C25SV003 S-100
CONCRETE, VIBRATORY LASER SCREED, 8'
30 HP
D-off
3,487
29.10
7.99
11.59
2.19
1.62
72
WIDE X 12' BOOM
C25SV002 S-160
CONCRETE, VIBRATORY LASER SCREED, 8'
65 HP
D-off
1,022
49.42
13.26
19.25
3.63
3.52
126
WIDE X 20' BOOM
C25SV001 S-240
CONCRETE, VIBRATORY LASER SCREED, 12'
65 HP
D-off
4,939
60.20
16.49
23.94
4.52
3.52
151
WIDE X 20' BOOM
SUBCATEGORY 0.30
MATERIAL/TOPPING SPREADERS
ALLEN ENGINEERING CORP.
C25AJ008
SP23H
CONCRETE, MATERIAL/TOPPING SPREADER,
6 HP
G
,094
3.74
0.80
1.15
0.22
0.72
11
12.5' WIDE
C25AJ009
SP23H
CONCRETE, MATERIAL/TOPPING SPREADER,
6 HP
G
,907
3.90
0.84
1.22
0.23
0.72
12
20' WIDE
2-53