WBS Number
DESCRIPTION
QTY
UOM
UNIT
COST
COST
$
342XX 13 05
MGA
13 06
MGA
13 07
Air Stripping
MGA
13 08
Steam Stripping
MGA
13 09
Soil Washing (Surfactant/Solvent)
CY
13 10
Soil Flushing (Surfactant/Solvent)
CY
13 11
Solids Dewatering
CY
13 12
Oil/Water Separation
MGA
13 13
Dissolved Air Floatation
MGA
13 14
Heavy Media Separation
CY
13 15
Distillation
MGA
13 16
Chelation
MGA
13 17
Solvent Extraction
MGA
13 18
Supercritical Extraction
MGA
13 19
Carbon Adsorption - Gases
CF
13 20
Carbon Adsorption - Liquids
MGA
13 21
Membrane Separation - Reverse Osmosis
MGA
13 22
Membrane Separation - Electrodialysis
MGA
27,800 CY
34.74 965,676
13 23
Soil Vapor Extraction
13 24
Shredding
CY
13 25
Aeration
CY
13 26
Advanced Electrical Reactor
CY
13 27
Low Level Waste (LLW) Compaction
CY
13 28
Agglomeration
CY
13 29
In-Situ Steam Extraction
MGA
13 30
Filter Presses
MGA
13 31
Lignin Adsorption/Sorptive Clays
CY
37,400 MGA
17.15 641,409
13 32
Air Sparging
13 50
Post Construction O&M of Permanent Plant Facility
EA/YR
13 9x
Other (Use Numbers 90-99)
14
THERMAL TREATMENT
14 01
Incineration
CY
14 02
Low Temperature Thermal Desorption
CY
14 03
Supercritical Water Oxidation
MGA
14 04
Molten Salt Destruction
CY
14 05
CY
14 06
Solar Detoxification
CY
14 07
High Temperature Thermal Desorption
CY
14 50
Post Construction O&M of Permanent Plant Facility
EA/YR
14 9x
Other (Use Numbers 90-99)
15
STABILIZATION/FIXATION/ENCAPSULATION
15 01
Molten Glass
CY