APPENDIXB
Project Costs
PROJECTED COSTS
Site:
Landfill 5
Description:
The selected treatment technology consists of air sparging in combination
Location:
Ft. Griffey, Ohio
with soil vapor extraction in the source area. Capital costs were incurred
Phase:
Interim RA Report
in Year 0 (1994). Actual O&M costs were incurred in Years 1 (1995)
1994, 1995-1999, 2000
Base Year:
through 5 (1999). Projected O&M costs are assumed for Years 6 (2000)
March 30, 2001
Date:
through 15 (2009). Periodic costs are incurred in Years 5, 10, and 15.
O&M COSTS (Years 6-15):
UNIT
DESCRIPTION
QUANTITY
UNIT
COST
TOTAL
NOTES
342XX HTRW O&M
.02 Monitoring, Sampling, Testing, and Analysis
10
YR
,149
1,490
.90 Performance Monitoring - SVE Vapor
1 sample/month * 6 extraction wells
.91 Performance Monitoring - SVE Emissions
10
YR
,692
,920
10
YR
,200
2,000
Sample 8 wells/event VOCs, metals
10
YR
,920
9,200
Analysis for above
SUBTOTAL
9,610
.13 Physical Treatment
.32 Air Sparging
.05 Utilities
10
YR
,254
,536
.09 Operations Labor
10
YR
,376
3,760
54 manhours per month
10
YR
,456
,560
.10 Maintenance Labor
6 manhours per month
.90 Equipment Repair
1
EA
,000
,000
2,856
SUBTOTAL
.13 Physical Treatment
.23 Soil Vapor Extraction
.05 Utilities
10
YR
,880
8,804
10
YR
,064
0,640
.09 Operations Labor
82 manhours per month
10
YR
,184
,840
.10 Maintenance Labor
10 manhours per month
.90 Equipment Repair
1
EA
,000
,000
4,284
SUBTOTAL
.18 Disposal (Other than Commercial)
.90 Wastewater Discharge/Testing
16,000
GA
||content||
.25
,000
Purge & knockout water
||content||
,626,750
SUBTOTAL
10%
162,675
Contingency
||content||
,789,425
SUBTOTAL
5%
89,471
Project Management
Technical Support
10%
178,943
TOTAL O&M COST (Years 6-15)
,057,839
2000
PERIODIC COSTS (Years 10, 15):
UNIT
DESCRIPTION
YEAR
QUANTITY
UNIT
COST
TOTAL
NOTES
10
1
Each
,000
,000
Five Year Review Report
1 report at end of Year 10
15
1
Lump Sum
,250
,250
Demob SVE System 342XX.13.23.99
Remove equipment and piping
Demob AS System 342XX.13.32.99
15
1
Lump Sum
,125
,125
Remove equipment and piping
Well Abandon 342XX.02.04.20
15
28
Each
0
,800
15%
4,676
Contingency (% of Sum)
% of construction activities
5%
1,793
Project Mgt. (% of Sum + Cont.)
% of construction + contingency
Final RA Report
15
1
Each
,000
,000
,644
SUBTOTAL
,644
TOTAL PERIODIC COST (Years 10, 15)
2000
TOTAL PROJECTED COST (Years 6-15)
,111,483
B-3
Ft. Griffey Landfill 5 OU Interim RA Report