SECTION SIX
Final Inspections and Certifications
INSPECTIONS
The pre-final and the Federal facilities agreement inspections of the AS/SVE system construction
were conducted simultaneously on December 27, 1999, in the presence of USEPA, DoD, OEPA,
and USACE representatives.
Observations, inspections, and testing during operation of the AS/SVE treatment system found
no significant operational problems affecting the performance of the remedial action.
CERTIFICATIONS
On September 4, 1995, the AS/SVE system was certified as Operating Properly and
Successfully. This determination was required under the Federal facilities agreement.
HEALTH AND SAFETY
No health and safety problems were encountered during construction or operation. Modified
Level D personal protective equipment (PPE) was required for all site personnel who entered the
site. The equipment included coveralls, safety boots, and nitrile gloves.
6-1
Ft. Griffey Landfill 5 OU Interim RA Report